Presentation is loading. Please wait.

Presentation is loading. Please wait.

Action TR1201: Indicative pipeline specs/multiparty use

Similar presentations


Presentation on theme: "Action TR1201: Indicative pipeline specs/multiparty use"— Presentation transcript:

1 Action TR1201: Indicative pipeline specs/multiparty use
Complex even with simplifying assumptions but as an indicative guide: There are numerous other factors to be considered in applying this; two examples: Increased diameter vs. increased length In most cases additional capability is provided through pipeline duplication and a larger increment is provided through increasing the length of the duplication rather than the diameter Use of compression Development of existing compressor station may not trigger Planning Act process; ‘switchover’ point between pipeline and compression solution (e.g. between single / multi party) may be critical For more information please refer to the Transmission Planning Code (NG website) Specifically section 9 describes the factors considered when planning network reinforcement Indicative maximum flows for 150km pipeline; inlet pressure 75 barg, outlet pressure 50barg Nominal Pipeline diameter Max Flow mscm/d Cost Ratio 450 mm (18 inch) 6 600 mm (24 inch) 12 1 900 mm (36 inch) 34 1.15 1050 mm (42 inch) 51 1200 mm (48 inch) 73 1.21 1


Download ppt "Action TR1201: Indicative pipeline specs/multiparty use"

Similar presentations


Ads by Google