Download presentation
Presentation is loading. Please wait.
Published byClare Ray Modified over 6 years ago
1
Submission Title: ULP TG Closing Report Athens Greece
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ULP TG Closing Report Athens Greece Date Submitted: September 2014 Source: SS Shahriar Emami, Samsung 75 W Plumeria Drive, San Jose, CA, USA Abstract: Closing report for the ULP TG Session Purpose: Overview of activities during the meeting Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further stu dy. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Shahriar Emami, Samsung
2
Athens, Greece September 2014
ULP TG Closing Report Athens, Greece September 2014 Shahriar Emami, Samsung
3
September 2014 Sessions Total of 6 time slots - PM2 on Monday
- AM1 and PM1 on Tuesday - AM1 on Wednesday - AM1 and AM2 on Thursday Shahriar Emami, Samsung
4
Achievements Received comments from TEG Prepared the draft
September 2014 Achievements Received comments from TEG Prepared the draft Shahriar Emami Samsung
5
September 2014 WG Motion 1 Move that the WG start a WG Letter Ballot, requesting approval to forward document d1.0P q_Draft_Standard.pdf to sponsor Ballot. Moved by: Shahriar Emami Seconded by: Art Astrin Coexistence assurance document for inclusion in the letter ballot is q 28-1-3
6
September 2014 WG Motion 2 Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the q draft standard with the following membership: Shahriar Emami, Allan Zhu, Frederik Beer, Hendricus De Ruijter, CHANDRASHEKHAR THEJASWI PS, Kiran Bynam and Youngsoo Kim. The q BRC is authorized to approve comment resolutions on behalf of the WG. Comment resolution between sessions will be conducted via reflector and via teleconferences announced to the reflector at least 30 days in advance. Moved by: Shahriar Emami Seconded by: Art Astrin Carried unanimously
7
Work Plan All the received comments to be addressed by BRC
September 2014 Work Plan All the received comments to be addressed by BRC Shahriar Emami, Samsung
8
Weekly Teleconferences
September 2014 Weekly Teleconferences Every Wednesday until end of 2014 8:00AM PDT, 20:30 PM IST, 17:00 PM CET, 12:00 AM KST Shahriar Emami, Samsung
9
Timeline (1) September 2014 Preliminary work
- Call for applications Dec 2012 - Applications presentations Jan 2013 - TGD outline March 2013 - TGD, applications and channel modeling contribution call March 2013 - Review TGD contributions May 2013 - TGD Ongoing & review application contributions July 2013 Proposal effort - Call for intent July 2013 - TGD completed Sep 2013 - Call for proposals Sep 2013 - Proposal presentations Nov 2013 Drafting - First draft May 2014 Shahriar Emami, Samsung
10
Timeline (2) Ballotable draft July 2014 Balloting
September 2014 Timeline (2) Ballotable draft July 2014 Balloting - WG letter ballot Sep 2014 - First recirculation Nov 2014 - Conditional approval of sponsored ballot Nov 2014 - Sponsor ballot Jan 2015 - First recirculation March 2015 - Conditional approval to submit to Revcom March 2015 Shahriar Emami, Samsung
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.