Download presentation
Presentation is loading. Please wait.
1
OPERATING BUDGET MAJOR ITEMS
MERRIMACK HIGH SCHOOL CAFÉ - HVAC Cost is $ 539, for the HVAC unit Replaces the HVAC unit originally installed in 1977 (unit services café and kitchen with ventilation & heat) Kitchen ventilation is non-compliant by today’s standards
2
HVAC Unit for Merrimack High School $539,827 – air exchange unit for kitchen and cafeteria
3
HVAC Unit for Merrimack High School $539,827 – air exchange unit for kitchen and cafeteria
4
HVAC Unit for Merrimack High School $539,827 – air exchange unit for kitchen and cafeteria
5
MERRIMACK HIGH SCHOOL SIDEWALK REPAIR:
Cost is $ 55,000.00 Chipped and cracked concrete
6
MHS Sidewalk to be Replaced Location - $55,000
7
MHS Sidewalk Repair $55,000
8
MHS Sidewalk Repair $55,000
9
MERRIMACK MIDDLE SCHOOL SIDEWALK REPLACEMENT:
Cost is $ Chipped and cracked concrete
10
Middle School Sidewalk Location - $98, 660
11
Merrimack Middle School Sidewalk Replacement
12
Merrimack Middle School Sidewalk Replacement
13
Merrimack Middle School Sidewalk Replacement
14
THORNTONS FERRY SCHOOL ROOF:
Cost is $ 577,825 – warranty period ended in 2007 Roof replacement of 24,513 sq. ft. (8 out of 14 total sections ) New Roof will have a 35-year warranty There are on-going roof leaks, seams of sheet sections are splitting/tearing, and there are pitch issues
15
Thorntons Ferry Roof
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.