Download presentation
Presentation is loading. Please wait.
Published byHanna Ervik Modified over 6 years ago
1
Preliminary Sediment Results Rune Palerud, Akvaplan-Niva
EMMA 2 Planning and management of aquaculture parks for sustainable development of cage farms in the Philippines (AquaPark) Preliminary Sediment Results Rune Palerud, Akvaplan-Niva Mid-term results EMMA 2
2
SUAL EMMA 2 Mid-term results
3
Rosenberg, 2001 Mid-term results EMMA 2
4
Hargrave et al. 2008 Mid-term results EMMA 2
5
Hargrave et al. 2008 Mid-term results EMMA 2
6
Norwegian standard Mid-term results EMMA 2
7
Grab sampling stations in Sual
Mid-term results EMMA 2
8
Corer sampling stations in Sual
Mid-term results EMMA 2
9
Natural sediment Heavily impacted sediment
Mid-term results EMMA 2
10
Corer at cage 20 cm black layer
Mid-term results EMMA 2
11
Corer 87 m from cage 13 cm black layer
Mid-term results EMMA 2
12
Corer 500 m from cage 5 cm black layer
Mid-term results EMMA 2
13
Corer 800 m from cage no black layer
Mid-term results EMMA 2
14
Corer in cage area 20 cm black layer
Mid-term results EMMA 2
15
Corer in cage area 23 cm black layer
Mid-term results EMMA 2
16
Corer in cage area Anoxic bacteria layer
Mid-term results EMMA 2
17
Corer 600 m from cage no black layer
Mid-term results EMMA 2
18
Mid-term results EMMA 2
19
Mid-term results EMMA 2
20
Mid-term results EMMA 2
21
SALAMAT PO Mid-term results EMMA 2
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.