Download presentation
Presentation is loading. Please wait.
Published byNigel Scott Modified over 6 years ago
1
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
19-April-05 CSC Hot Spares LV Modules (24 units needed) Wiener PFC module spares 4 new + (2 old lower power) 1 on hand 1 with ECAL for special testing 1 failed yesterday 1 in repair Wiener Maraton Crates 4 units 4 on hand HV Modules ME1/1 CAEN system FU custom system > 40 master brds, 270 distribution brds 20% spares at CERN Custom Modules FED Crates – 4 crates 1 spare crate with PS – being shipped to CERN 1 spare on order 1 PS failed last week – using spare from CERN POOL Pcrates – 20% spares of all crates and boards at CERN On-chamber – 20% spares at CERN 17-Jan-19 CSC Hot Spares
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.