Presentation is loading. Please wait.

Presentation is loading. Please wait.

FSR 06 — plant & EQUIPMENT isolations & lockouts

Similar presentations


Presentation on theme: "FSR 06 — plant & EQUIPMENT isolations & lockouts"— Presentation transcript:

1 FSR 06 — plant & EQUIPMENT isolations & lockouts
Understanding your Workplace Specific Critical Controls Instructions: The images in this presentation should depict the specific controls you have agreed at your workplace. Substitute these images for the actual controls you will be using and expect to see implemented.

2 FSR 06 – plant & EQUIPMENT isolations & lockouts
INTENT: To eliminate or minimise the risks of fatalities, injuries and events arising from energised plant at installation, testing, commissioning and decommissioning phases of operation What are the supporting documents you should refer: Primary Standards PS Plant & Equipment Isolations & Lockouts PS General Electrical Safety PS Permits to Work Related Forms E-T Service Isolation Permit E-T Authority to Remove Tag and Lock

3 Critical Control 1 ALL POTENTIAL HARMFUL ENERGY SOURCES REQUIRING ISOLATION AND APPROPRIATE ISOLATION METHODS ARE IDENTIFIED BY COMPETENT PERSONS

4 Critical Control 2 ISOLATION (LOTO) TRAINING AND COMPETENCY SYSTEM IN PLACE

5 Critical Control 3 ISOLATION PROCEDURES ARE SPECIFIC TO THE NEEDS OF THE WORKSITE, AS DETERMINED BY THE RISK ASSESSMENT

6 Critical Control 4 ROLES ARE APPOINTED – AUTHORISED ISOLATOR, PERMIT ISSUER AND PERMIT HOLDER

7 Critical Control 5 UNLESS TESTED FOR DEAD, ALL WIRES AND EQUIPMENT ARE CONSIDERED AND TREATED AS LIVE

8 Critical Control 6 ISOLATION PERMITS ARE IN PLACE

9 Critical Control 7 ISOLATION INTEGRITY INCLUDES PHYSICAL TRY TEST (CHECK FOR DEAD)

10 Critical Control 8 RESTRICTED ACCESS CONTROLS IS IN PLACE WHERE EQUIPMENT CANNOT BE FULLY ISOLATED TO ZERO ENERGY

11 Critical Control 9 ISOLATIONS ARE IN PLACE FOR SERVICING AND MAINTENANCE WORK

12 KNOWLEDGE DISCUSSION After today’s session, what will you do differently when participating in your next FSR? How do you think this will benefit you? Who do you think you can share this knowledge with? How do you think we can improve the controls?

13 CRITICAL CONTROLS INCREASING OUR UNDERSTANDING QUESTIONS?


Download ppt "FSR 06 — plant & EQUIPMENT isolations & lockouts"