Presentation is loading. Please wait.

Presentation is loading. Please wait.

FD TIG mid-week report Date: Authors: September 2018 Name

Similar presentations


Presentation on theme: "FD TIG mid-week report Date: Authors: September 2018 Name"— Presentation transcript:

1 FD TIG mid-week report Date: 2018-09-12 Authors: September 2018 Name
Month Year doc.: IEEE yy/xxxxr0 September 2018 FD TIG mid-week report Date: Authors: Name Affiliations Address Phone James Gilb GA-ASI, USD, GenXComm, Gilb Consulting Slide 1 1 1 Page 1 John Doe, Some Company

2 Month Year doc.: IEEE yy/xxxxr0 September 2018 Abstract Mid-week report for FD TIG (Full Duplex Technical Interest Group) September 2018 Hilton Waikoloa Village, Waikoloa, HI USA Chair: James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) Slide 2 James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) 2 2 Page 2 John Doe, Some Company

3 The FD-TIG feels that the FD-TIG report is essentially complete
September 2018 Mid-week report The FD-TIG feels that the FD-TIG report is essentially complete Request that members review the report and provide comments by or by attending Thursday AM1 Report: Respond to and FD-TIG will consider report approval, Thursday AM1 Recommendation is to form SG For EC approval at November 2018 plenary Request to extend TIG until the end of November 2018 plenary Slide 3 James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) 3

4 Additional FD-TIG tasks for September to November
The WG has extensive experience with defining the key performance parameters of the PHY layer With FD, there are different key performance parameter e.g., self interference cancellation Need PHY experts to discuss how this should be specified Identify the clauses and subclauses of that will be potentilally affected. Use cases with numbers, i.e., # of stations, type of traffic Identify simulation environments, channel models to use. Slide 4 James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) 4

5 Additional FD-TIG tasks for September to November
The WG has extensive experience with defining the key performance parameters of the PHY layer With FD, there are different key performance parameter e.g., self interference cancellation Need PHY experts to discuss how this should be specified Identify the clauses and subclauses of that will be potentilally affected. Use cases with numbers, i.e., # of stations, type of traffic Identify simulation environments, channel models to use. Slide 5 James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) 5

6 Peiwei Wang will present a short video showing FD operation
September 2018 FD demonstrations Peiwei Wang will present a short video showing FD operation Reference documents (presentation) and (document describing results. Thursday AM1 Live remote FD demo with colleagues in Ottawa Will stream video and have Q&A Refer to the FD-TIG draft report for other demonstrated FD systems Slide 6 James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) 6


Download ppt "FD TIG mid-week report Date: Authors: September 2018 Name"

Similar presentations


Ads by Google