1 Information Derived from EC/ED 67484 Crystal River Nuclear Plant
1/17/2019 4:23 AM CR3 Steam Generator Replacement Movement Steps for Removal and Installation Information Derived from EC/ED 67484 Linda Pressley McCray Nuclear Designer Crystal River Nuclear Plant © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

2 Performance of Motion Analysis
First, a 3D Model was created which includes all structures, systems and components located within the D-ring. All input for the model was gathered from pertinent component information located on the associated CR3 Station drawing.

3 Performance of Motion Analysis
Next, an independent validation of the original 3D model geometry was performed by the SGR Project Design group.

4 Performance of Motion Analysis
An additional layer of model validation was performed by AREVA who overlaid our CR3 3D model on top of AREVA’s 3D Laser Scanned model AREVA compiled a list of all deltas found within a four foot radius surrounding each generator Each delta has been resolved and the SGR 3D model is considered to be an accurate depiction of the CR3 as-built configuration

5 Performance of Motion Analysis
A motion analysis has been performed for each generator which identifies all potential interferences and specifies a removal and installation path that provides sufficient clearances to all identified plant structures, systems and components

6 Symbols Used The light blue North Arrow is used as a stationary point for tracking purposes on each clearance drawing. Point originates from the center of the EL 95'. The yellow and red North Arrow is embedded in the generator to show generator movement.

7 Symbols Used Denotes clearance of 6 inches or less. Great care must be taken at caution points to prevent the generator from colliding with plant structures, systems and/or components

8 CLEARANCES < 6 INCHES
Generator “A” Removal Path assumes all service water piping remains in place during the removal phase. This will provide the option of removing appropriate sections of service water piping after the existing generators have been removed. STEP # GENERATOR MOVEMENT MOVEMENT DESCRIPTION CLEARANCES < 6 INCHES NOTES 1 Raise generator 25 Feet Positions cold leg pieces for unobstructed rotation 4 3/8" between service water piping and generator nozzle on east side (CLEARANCE MUST BE REDUCED BY PIPING INSULATION THICKNESS) Remaining clearances exceed 6 inches Generator 120'-0" EL 2 Rotate Clockwise 90 Degrees Repositions cold leg pieces for unobstructed removal None < 6 Inches 3 Raise 60 Feet - 6 Inches Raises generator above remaining obstructions Generator 180'-6" EL

9 Generator “A” Removal The auxiliary feedwater header and main feedwater header will be disassembled and removed from generator “A” prior to removal of generator Auxiliary Feedwater Header Main Feedwater Header

10 Generator “A” Removal INITIAL STEP PLAN VIEW Prior to manipulation
Auxiliary feedwater header and main feedwater header will be removed prior to removal of generator

11 Generator “A” Removal INITIAL STEP ELEVATION VIEW
Prior to manipulation Generator base is at EL 95’-0” Auxiliary feedwater header and main feedwater header will be removed prior to removal of generator

12 Generator “A” Removal INITIAL STEP ISOMETRIC VIEW
Prior to manipulation Generator base is at EL 95’-0”

13 Generator “A” Removal STEP #1 ELEVATION VIEW Raise Generator 25 Feet
Generator base is at EL 120’-0” Positions cold leg pieces for unobstructed rotation

14 Generator “A” Removal STEP #1 PLAN VIEW CLEARANCES Raise 25 Feet
Clearances shown between vertical steel and generator cylinder on west side and between RCP steel and generator cylinder on both east and west sides

15 Generator “A” Removal STEP #1 ISOMETRIC VIEW Raise 25 Feet
Generator base is at EL 120’-0”

16 Generator “A” Removal STEP #2 PLAN VIEW CLEARANCES
Rotate Clockwise 90 Degrees Positions cold leg pieces for unobstructed removal path Clearances shown between vertical steel and generator cylinder on west side, between service water piping and generator cylinder on east side, and between RCP steel and generator cylinder on both east and west sides.

17 Generator “A” Removal STEP #3 ELEVATION VIEW Raise 60 FEET – 6 INCHES
Raises generator above remaining obstructions Generator base is at EL 180’-6”

18 Prepare To Install Replacement Generator

19 Generator “A” Installation Insulation Support Assemblies
Some of the insulation support assemblies shown on the replacement generator are placed in temporary locations for installation to eliminate interferences during rigging These insulation support assemblies will be moved to their final destination after the replacement generator has been installed

20 Generator “A” Installation
Path assumes removal of interfering portions of the following as designated in the governing EC package: Service Water Piping , , , and associated hangers; and One Inch Piping 3A-4153-SW-2, 3A-4154-SW-1 and associated hangers. STEP # GENERATOR MOVEMENT MOVEMENT DESCRIPTION CLEARANCES < 6 INCHES NOTES 1 Drift North 21 Inches Positions generator for initial lowering movement None < 6 Inches Generator 180'-6" EL 2 Drift West 4.5 Inches Equalizes distance between interferences prior to lowering 3 Lower 68 Feet Places main feedwater header below rcp support steel Generator 112'-6" EL 4 Drift South 10 Inches Moves generator away from main steam hangers

21 Generator “A” Installation
STEP # GENERATOR MOVEMENT MOVEMENT DESCRIPTION CLEARANCES < 6 INCHES NOTES 5 Drift East 4.5 Inches Moves generator away from vertical 128'-0" EL None < 6 Inches Generator 112'-6" EL 6 Lower 11 Feet 6 Inches Moves generator to suitable point for final positioning 4 13/16" between main feedwater header ring and vertical steel (see Step 6 Elevation #1) Generator 101'-0" EL 7 Drift South 11 Inches Returns generator to original coordinates prior to setting 3 5/8" between rcp steel and nearest aux. feedwater header riser (see Step 7 Elevation #2) 4 13/16" between main feedwater header ring and vertical steel (see Step 7 Elevation #1) 8 Lower 6 Feet Sets generator 4 13/16" between main feedwater header ring and vertical steel (see Step 8 Elevation #1) Generator 95'-0" EL

22 Generator “A” Installation
INITIAL STEP PLAN VIEW Prior to manipulation Generator base is at EL 180’-6”

23 Generator “A” Installation
INITIAL STEP ELEVATION Prior to manipulation Generator base is at EL 180’-6” Generator “A” Coordinates: (From Reactor Building center to center of generator base) X = 17’-9 31/32” Y = 30’-4 ½” Z = 180’-6”

24 Generator “A” Installation
INITIAL STEP ISOMETRIC VIEW Prior to manipulation Generator base is at EL 180’-6”

25 Generator “A” Installation
STEP #1 PLAN VIEW Drift North 21 Inches Generator base is at EL 180’-6” Moves generator away from obstacles interfering with first downward movement

26 Generator “A” Installation
STEP #2 PLAN VIEW Drift West 4.5 Inches Generator base is at EL 180’-6” Equalizes distance between interferences prior to lowering

27 Generator “A” Installation
STEP #3 ELEVATION VIEW Lower 68 Feet Generator base is at EL 112’-6” Places main feedwater header below RCP support steel

28 Generator “A” Installation
STEP #3 PLAN VIEW CLEARANCES Lower 68 Feet Generator base is at EL 112’-6” Places main feedwater header below RCP support steel Clearances shown occur DURING downward movement.

29 Generator “A” Installation
STEP #3 ELEVATION VIEW CLEARANCES Lower 68 Feet Generator base is at EL 112’-6” Clearance shown is between main feedwater header outlet and steel at EL 164’-1”

30 Generator “A” Installation
STEP #3 PLAN VIEW CLEARANCES Lower 68 Feet Generator base is at EL 112’-6” Clearances shown reflect dimensions AFTER generator is lowered to EL 112’-6”

31 Generator “A” Installation
STEP #3 ISOMETRIC VIEW Lower 68 Feet Generator base is at EL 112’-6” Places main feedwater header below RCP support steel

32 Generator “A” Installation
STEP #4 PLAN VIEW CLEARANCES Drift South 10 Inches Generator base is at EL 112’-6” Moves generator away from main steam hangers

33 Generator “A” Installation
STEP #4 ROTATED ISOMETRIC VIEW Drift South 10 Inches Generator base is at EL 112’-6” Moves generator away from main steam hangers

34 Generator “A” Installation
STEP #5 PLAN VIEW CLEARANCES Drift East 4.5 Inches Generator base is at EL 112’-6” Moves generator away from vertical steel at EL 128’-0”

35 Generator “A” Installation
STEP #6 ELEVATION VIEW Lower 11 Feet 6 Inches Generator base is at EL 101’-0” Moves generator to suitable point for final positioning

36 Generator “A” Installation
STEP #6 PLAN VIEW CLEARANCES Lower 11 Feet 6 Inches Generator base is at EL 101’-0” Moves generator to suitable point for final positioning

37 Generator “A” Installation
STEP #6 ELEVATION VIEW CLEARANCES Lower 11 Feet 6 Inches Generator base is at EL 101’-0” Clearances shown are between the main feedwater header ring and the vertical steel located on the east and west

38 Generator “A” Installation
STEP #7 PLAN VIEW CLEARANCES Drift South 11 Inches Generator base is at EL 101’-0” Returns generator to original coordinates prior to setting 3 5/8” clearance is between the corner of the RCP steel and the nearest aux. feedwater header riser and is shown in elevation view on the next slide

39 Generator “A” Installation
STEP #7 ROTATED VIEW CLEARANCE Drift South 11 Inches 3 5/8” clearance is between the corner of the RCP steel and the nearest aux. feedwater header riser Clearance is shown in PLAN VIEW view on previous slide

40 Generator “A” Installation
STEP #7 ELEVATION VIEW CLEARANCES Drift South 11 Inches Generator base is at EL 101’-0” Clearances shown are between the main feedwater header ring and the vertical steel located on the east and west As generator is drifted south the clearances between the main feedwater header ring and the vertical steel remain the same as in Step #6

41 Generator “A” Installation
STEP #8 ELEVATION VIEW CLEARANCE Lower 6 Feet Sets Generator – Base is at EL 95’-0” Clearance shown is between the main feedwater header ring and the vertical steel located east of the generator

42 Generator “A” Installation
STEP #8 PLAN VIEW CLEARANCES Lower 6 Feet Sets Generator Generator Base is at EL 95’-0” This final lowering movement places the aux. feedwater header risers below the RCP steel. 4 13/16” clearance is between the main feedwater header ring and the vertical steel (see previous slide)

43 Generator “A” Installation
STEP #8 SIDE VIEW VERTICAL CLEARANCE Lower 6 Feet Sets Generator Generator Base is at EL 95’-0” Vertical clearance shown is between the RCP steel and the nearest aux. feedwater header riser

44 Generator “A” Installation
STEP #8 ELEVATION GENERATOR IS SET Final Destination Generator Base is at EL 95’-0”

45 Prepare To Remove “B” Generator

46 CLEARANCES < 6 INCHES
Generator “B” Removal Path assumes all service water piping remains in place during the removal phase. This will provide the option of removing appropriate sections of service water piping after the existing generators have been removed. STEP # GENERATOR MOVEMENT MOVEMENT DESCRIPTION CLEARANCES < 6 INCHES NOTES 1 Raise generator 25 Feet Positions cold leg pieces for unobstructed rotation None < 6 Inches Generator 120'-0" EL 2 Rotate Counter-Clockwise 90 Degrees Repositions cold leg pieces for unobstructed removal 3 Raise 60 Feet - 6 Inches Raises generator above remaining obstructions Generator 180'-6" EL

47 Generator “B” Removal The auxiliary feedwater header and main feedwater header will be disassembled and removed from generator “B” prior to removal of generator Auxiliary Feedwater Header Main Feedwater Header

48 Generator “B” Removal INITIAL STEP ELEVATION VIEW
Prior to manipulation Generator base is at EL 95’-0” Auxiliary feedwater header and main feedwater header have been removed

49 Generator “B” Removal INITIAL STEP ISOMETRIC VIEW
Prior to manipulation Generator base is at EL 95’-0”

50 Generator “B” Removal STEP #1 ELEVATION VIEW Raise Generator 25 Feet
Generator base is at EL 120’-0” Positions cold leg pieces for unobstructed rotation

51 Generator “B” Removal STEP #1 PLAN VIEW CLEARANCES
Raise Generator 25 Feet Generator base is at EL 120’-0” Positions cold leg pieces for unobstructed rotation

52 Generator “B” Removal STEP #2 PLAN VIEW CLEARANCES
Rotate Counter-Clockwise 90 Degrees Generator base is at EL 120’-0” Repositions cold leg pieces for unobstructed removal

53 Generator “B” Removal STEP #2 ELEVATION VIEW Rotate Counter-Clockwise
90 Degrees Generator base is at EL 120’-0” Repositions cold leg pieces for unobstructed removal

54 Generator “B” Removal STEP #3 PLAN VIEW CLEARANCES
Raise Generator 60 Feet – 6 Inches Generator base is at EL 180’-6” Raises generator above remaining obstructions

55 Generator “B” Removal STEP #3 ELEVATION
Raise Generator 60 Feet – 6 Inches Generator base is at EL 180’-6” Raises generator above remaining obstructions

56 Prepare To Install Replacement Generator
Safety….Priority #1

57 Generator “B” Installation
NOTE: A Motion Analysis Contingency Plan was created in case the service water piping in “B” cubicle is left in place The Contingency Plan steps are located here: EC/ED R1 Attachment Z10

58 Generator “B” Installation Insulation Support Assemblies
Some of the insulation support assemblies shown on the replacement generator are placed in temporary locations for installation to eliminate interferences during rigging These insulation support assemblies will be moved to their final destination after the replacement generator has been installed

59 Generator “B” Installation
Path assumes removal of interfering portions of the following as designated in the governing EC package: Service Water Piping , , , and associated hangers STEP # GENERATOR MOVEMENT MOVEMENT DESCRIPTION CLEARANCES < 6 INCHES NOTES 1 Drift South 19 Inches Provides clearance between main feedwater header and rcp steel None < 6 Inches Generator 180'-6" EL 2 Lower 68 Feet Places main feedwater header and risers below rcp steel 5 25/32" between main feedwater header ring and rcp steel west of generator Generator 112'-6" EL 3 Drift North 10 Inches Equalizes distances between interferences for next downward movement (step #4) 4 Lower 8 Feet Places main feedwater header below vertical main feedwater rupture restraints and places aux. feedwater header above rcp steel Generator 104'-6" EL 5 Drift South 3 Inches Provides clearance between rcp steel and aux. feedwater header ring on west side of generator 5 3/32" clearance between main feedwater header ring and main feedwater piping support 6 Drift East 3 Inches Provides additional clearance between rcp steel and aux feedwater header ring on the west side of generator prior to next lowering step

60 Generator “B” Installation
STEP # GENERATOR MOVEMENT MOVEMENT DESCRIPTION CLEARANCES < 6 INCHES NOTES 7 Lower 4 Feet Places main feedwater header and risers below vertical steel and moves aux. feedwater header ring below rcp steel 4 15/16" clearance occurs when aux feedwater header ring passes the rcp steel during this lowering movement Generator Base @ 100'-6" EL 8 Drift West 3 Inches Returns generator to original western coordinates None < 6 Inches 9 Lower 4 Feet 3 Inches Moves aux. feedwater header risers below rcp steel Generator Base @ 96'-3" EL 10 Drift North 12 Inches Returns generator to original coordinates prior to setting 1 7/8" vertical clearance between RCP steel and nearest aux feedwater header riser - should not impede movement because the diagonal clearance exceeds 6" (See Elevation #1) 11 Lower 1 Foot 3 Inches Sets generator Generator Base @ 95'-0" EL

61 Generator “B” Installation
INITIAL STEP PLAN VIEW Prior to manipulation Generator base is at EL 180’-6”

62 Generator “B” Installation
INITIAL STEP ELEVATION Prior to manipulation Generator base is at EL 180’-6” Generator “B” Coordinates: (From Reactor Building center to center of generator base) X = 11’-21/32” Y = 30’-4 ½” Z = 180’-6”

63 Generator “B” Installation
INITIAL STEP ISOMETRIC VIEW Prior to manipulation Generator base is at EL 180’-6”

64 Generator “B” Installation
STEP #1 PLAN VIEW Drift South 19 Inches Generator base is at EL 180’-6” Provides clearance between main feedwater header ring and RCP steel for first downward movement

65 Generator “B” Installation
STEP #2 ELEVATION VIEW Lower 68 Feet Generator base is at EL 112’-6” Places main feedwater header and risers below RCP steel

66 Generator “B” Installation
STEP #2 PLAN VIEW CLEARANCES Lower 68 Feet Generator base is at EL 112’-6” Places main feedwater header and risers below RCP steel Clearances shown reflect dimensions between the main feedwater header ring and all potential interferences that occur during this lowering step

67 Generator “B” Installation
STEP #3 PLAN VIEW CLEARANCES Drift North 10 Inches Generator base is at EL 112’-6” Equalizes distances between interferences for next downward movement (Step #4)

68 Generator “B” Installation
STEP #3 ELEVATION VIEW CLEARANCES Drift North 10 Inches Generator base is at EL 112’-6” Clearances shown are between the main feedwater header outlets and the vertical steel on east and west sides

69 Generator “B” Installation
STEP #4 ELEVATION VIEW Lower 8 Feet Generator base is at EL 104’-6” Places main feedwater header below vertical main feedwater rupture restraints and places aux feedwater header above RCP steel

70 Generator “B” Installation
STEP #4 PLAN VIEW CLEARANCES Lower 8 Feet Generator base is at EL 104’-6” Places main feedwater header below vertical main feedwater rupture restraints and places aux feedwater header above RCP steel

71 Generator “B” Installation
STEP #4 ELEVATION VIEW CLEARANCES Lower 8 Feet Generator base is at EL 104’-6” Places main feedwater header below vertical main feedwater rupture restraints and places aux feedwater header above RCP steel Clearances shown above are between the main feedwater header ring and the vertical steel on east and west sides

72 Generator “B” Installation
STEP #5 PLAN VIEW CLEARANCES Drift South 3 Inches Generator base is at EL 104’-6” Provides clearance between RCP steel and aux. feedwater header ring on west side 5 3/32” clearance between main feedwater header ring and main feedwater piping support

73 Generator “B” Installation
STEP #6 PLAN VIEW CLEARANCES Drift East 3 Inches Generator base is at EL 104’-6” Provides additional clearance between RCP steel and aux. feedwater header ring on west side 5 3/32” clearance between main feedwater header ring and main feedwater piping support

74 Generator “B” Installation
STEP #6 ELEVATION VIEW LKG SOUTH CLEARANCES Drift East 3 Inches Generator base is at EL 104’-6” Provides additional clearance between RCP steel and aux. feedwater header ring on west side Clearances shown are between the main feedwater header ring and the vertical steel on east and west sides

75 Generator “B” Installation
STEP #7 ELEVATION VIEW Lower 4 Feet Generator base is at EL 100’-6” Places main feedwater header and risers below vertical steel and moves aux. feedwater header ring below RCP steel

76 Generator “B” Installation
STEP #7 PLAN VIEW CLEARANCES Lower 4 Feet Generator base is at EL 100’-6” Places main feedwater header and risers below vertical steel and moves aux. feedwater header ring below RCP steel 4 15/16” clearance occurs when aux. feedwater header ring passes the RCP steel during this lowering movement RCP steel clearance on east side is larger because the aux. feedwater header ring has a gap at that location

77 Generator “B” Installation
STEP #8 PLAN VIEW CLEARANCES Drift West 3 Inches Generator base is at EL 100’-6” Returns generator to original western coordinates 11 15/32” clearance is between the RCP steel and the nearest aux. feedwater header riser. The aux. feedwater header ring is below the RCP steel at this point

78 Generator “B” Installation
STEP #9 ELEVATION VIEW Lower 4 Feet 3 Inches Generator base is at EL 96’-3” Moves aux. feedwater header risers below RCP steel

79 Generator “B” Installation
STEP #9 PLAN VIEW CLEARANCES Lower 4 Feet 3 Inches Generator base is at EL 96’-3” Moves aux. feedwater header risers below RCP steel 11 15/32” clearance is between the RCP steel and the nearest aux. feedwater header riser DURING this lowering movement

80 Generator “B” Installation
STEP #9 ROTATED ELEVATION VIEW CLEARANCES Lower 4 Feet 3 Inches Generator base is at EL 96’-3” Moves aux. feedwater header risers below RCP steel Shows proximity of RCP steel to nearest aux. feedwater header riser (approximately 1 foot) This clearance becomes critical during the next step (Drift North 12") AUX. FW HEADER RISER RCP STEEL

81 Generator “B” Installation
STEP #9 ROTATED ELEVATION VIEW CLEARANCES Lower 4 Feet 3 Inches Generator base is at EL 96’-3” Moves aux. feedwater header risers below RCP steel Shows proximity of main steam hangers to aux. feedwater header ring and main feedwater header ring

82 Generator “B” Installation
STEP #9 ELEVATION VIEW CLEARANCES Lower 4 Feet 3 Inches Generator base is at EL 96’-3” Moves aux. feedwater header risers below RCP steel Shows proximity of generator cylinder to blowdown hangers

83 Generator “B” Installation
STEP #10 PLAN VIEW CLEARANCES Drift North 12 Inches Generator base is at EL 96’-3” Returns generator to original coordinates prior to setting 10 29/32” clearance is between the aux. feedwater header ring and the vertical steel

84 Generator “B” Installation
STEP #10 ELEVATION VIEW CLEARANCES Drift North 12 Inches Generator base is at EL 96’-3” Elevation View Looking East Shows proximity of RCP steel on west side of generator to nearest aux. feedwater header riser after drifting north 12 inches Elevation View Looking West Shows proximity of RCP steel on east side of generator to nearest aux. feedwater header riser after drifting north 12 inches

85 Generator “B” Installation
STEP #11 ELEVATION VIEW FINAL STEP Lower 1 Foot – 3 Inches Generator base is at EL 95’-0” Sets Generator

86 Successful Removal and Installation Time to Celebrate!
1/17/2019 4:23 AM Successful Removal and Installation Time to Celebrate! Questions or Comments? Call or Linda McCray x1533 © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.