Presentation is loading. Please wait.

Presentation is loading. Please wait.

CEOS Ad hoc Teams Lifecycle & Processes

Similar presentations


Presentation on theme: "CEOS Ad hoc Teams Lifecycle & Processes"— Presentation transcript:

1 CEOS Ad hoc Teams Lifecycle & Processes
Committee on Earth Observation Satellites CEOS Ad hoc Teams Lifecycle & Processes S Ward, NOAA SIT Chair Team CEOS 2018 SIT Technical Workshop Session 6 Agenda Item 6.3 EUMETSAT, Darmstadt, Germany 13 – 14 September 2018

2 Objectives and approach
SIT-33-11: Include CEOS Ad hoc Team lifecycle and processes as an agenda item on 2018 SIT Technical Workshop. (Rationale: SIT Chair has proposed that CEOS address inconsistencies in the operation of different types of groups across the structure.) reflect & report on group trajectory and lifecycle in relation to their thematic initiatives; clear understanding as to outlook & evolution and requirement & objectives for CEOS participation; consider geometry & capacity required to sustain efforts; options for continuity of progress beyond ad hoc arrangements; explore opportunities for synergies and efficiencies across the CEOS structure and our various processes and meetings, seeking consistency wherever possible. Presentation of facts in support of debate. Pre-consultation with AHT Leads in relation to their intentions Looking for consensus for Plenary decision – or actions to get there by Brussels

3 Contents Current teams Current procedures
Team proposed plans & outlook Issues for TW debate and Plenary decision

4 Current Teams Team External Interface Formed Report SDCG for GFOI
GFOI (GEO Flagship) (before CEOS Governance & Processes doc) CEOS Chair Ad-hoc WG for GEOGLAM GEOGLAM (GEO Flagship) 2012 (before CEOS Governance & Processes doc) FDA - 2015 SDGs GEO, EO4SDGs (GEO Priority) 2016 SIT Chair Internal Links LSI-VC & GEOGLAM AHWG (inc joint meetings) WGISS & LSI-VC EVERYTHING?!

5 Current Procedures Entity Formation Responsible Reporting CEOS WP Term WGs (5) CEOS Plenary decision CEOS Chair (SIT Chair secondary if agreed) - Monthly to CEOS SEC telecons - Annually to CEOS Plenary - Recently added to SIT Chair tag-ups and VC-WG day 48 active targets Permanent VCs (7) CEOS SIT decision, following the VC Process Paper. Rigorous leadership and resourcing criteria SIT Chair (CEOS Chair secondary if agreed) - SIT Chair tag-ups & VC-WG day - SIT and SIT TW meetings - Typically covered at Plenary (SIT Chair compendium) - Not included in CEOS SEC telecons 17 active targets AHTs (4) CEOS Plenary decision. Light on specifics and on leadership and resourcing. CEOS Chair or SIT Chair. - Routine reporting dropped from CEOS SEC telecons in Added to SIT Chair tag-ups in Added to VC/WG day agenda in As agenda dictates at SIT and Plenary meetings 9 active targets Defined when created with annual renewal at Plenary In the event that the permanent mechanisms described in the preceding paragraphs are judged to be insufficient for CEOS to undertake a particular activity, the capability exists for the Plenary to create Ad Hoc Teams. The Plenary assigns short-term objectives to each Ad Hoc Team and defines the team lifetime when the team is created. The primary reporting path for an Ad Hoc Team is either to the CEOS Chair or to the SIT Chair, as designated by the Plenary according to the purpose and function of the Ad Hoc Team. Annually, the Plenary reviews all Ad Hoc Teams for continuation, termination, or transition to a permanent mechanism.

6 Current Team Plans 1-year + Close Participation & Resources
Active agencies Outlook Plans SDCG for GFOI JAXA, ESA, UKSA, SEO, DLR, CSA Resources an issue. GFOI Phase 2. 2017 poll concluded a stand-alone team is preferred. But subject to confirmed critical mass of participation and operating capacity. Ad-hoc WG for GEOGLAM NASA, CNES, CSA, JAXA, ESA, CONAE, CSIRO, ISRO, SANSA Foresee vibrant and engaged GEOGLAM relationship Stand-alone group for a further year with recommendations to CEOS thereafter. FDA ESA, CSIRO, USGS Roadmap created – can be absorbed largely within WGISS and LSI Conclusion at Plenary SDGs ESA, CSIRO, NASA, JAXA Substantial implementation plan developed Participation and resources have not been forthcoming. Team advocates a permanent structure but critical mass needs to be determined. Participation & Resources 1-year + Close Participation & Resources

7 Assessment AHT mechanism have provided an effective and efficient mechanism to scope and progress new topics for CEOS Some consistency improvements lately VC/WG/AHT calls and day Further scope for consistency in reporting? eg a curated reports item to monthly SEC that covers all Three teams propose to progress SDGs has lots of plans but needs participation and capacity GEOGLAM wants a year’s grace to formulate way forward SDCG is is shaping its role within GFOI Phase 2 & taking stock of agency participation and support Current annual processes should be adequate for review but perhaps need more active application & less rubberstamping?

8 Issues for discussion Reflect on the AHT proposal and issues arising
Opportunities to improve related procedures Formation Reporting and operation (eg SEC suggestion) Review, renewal, closure/evolution Specific solutions for those AHTs that continue on VC, WG vehicles Migration (like FDA) Recommendations for Plenary and actions to firm them up

9 A Proposal for the Future of LSI-VC and the Ad Hoc Teams for SDCG for GFOI, GEOGLAM, and FDA
Prepared at the Joint Meeting For SDCG for GFOI / GEOGLAM / LSI-VC September 7, 2018 Ispra, Italy

10 Current Situation SDCG for GFOI and GEOGLAM teams are “Ad Hoc”, yet have existed for many years and have demonstrated significant contributions to GEO flagships. Continued annual approvals create uncertainty in the CEOS support to GEO flagships. Most agree that there is a need for a permanent solution. Secretariat support is needed for LSI and Ad Hoc teams, and there is an annual concern about funding. LSI-VC and Ad-Hoc teams are NOT reporting to CEOS SEC, which is an additional concern.

11 Options 3 Options Considered
Status Quo – Continued annual renewal of Ad Hoc Teams Create one (or more) new WGs or VCs to address Forests and Ag Merge Forest/Ag groups into LSI-VC (now or later)

12 Pros and Cons of Options 2 & 3
Status Quo Option 2 New WGs / VCs Option 3 New LSI-VC Subgroups Pros Continued strong independent identity for SDCG for GFOI and GEOGLAM Permanent existence Operational efficiencies – SEC support and combined meetings Technical efficiencies – ARD and interoperability, consolidated and optimized missions and measurements Strategic efficiencies – GEO, UN Con s Continued annual renewal and related uncertainty Annual uncertainty with SEC support Additional administrative overhead for the new WGs / VCs as well as for other CEOS organizational entities (Chair, SIT, CEO, SEO) Additional SEC support Risk losing “identity” to outside stakeholders and direct access to CEOS Agencies Risk losing visibility and reporting time at major CEOS meetings Will other GEO initiatives (e.g., GEOBON) seek to have the same arrangement under LSI-VC and add complexity to the solution? Concern of LSI-VC taking on too much since its “revitalization”. The team has proven it can produce significant results and that with Forests and Ag maintaining their leadership structure and resources, there would be little remaining concern or additional LSI-VC leadership burden.

13 Proposed Solution LSI-VC > maintains existing work (ARD, Interoperability), adds new Forests and Ag subgroups SDCG for GFOI > transition > New LSI-VC Forests Subgroup GEOGLAM > transition > New LSI-VC Ag Subgroup FDA > transition > Tasks moved to WGISS, LSI-VC, and SEO SEC support can be leveraged across all groups for operational efficiencies

14 Virtual Constellation (LSI-VC)
New LSI-VC Plan Land Surface Imaging Virtual Constellation (LSI-VC) SEC Support Tasks ARD Interoperability Requirements/Gaps Chair Forests Subgroup Tasks External Policy coordination Satellite Data (requirements, ARD production, access, tools, data services) SEC Support Lead Agriculture Subgroup Tasks SEC Support Lead

15 Other Topics Reporting and Meetings
Topical subgroups (Forests and Ag) continue to have their own focused meetings, as needed Continue ”broader” joint meeting, bringing together LSI-VC, Forests, and Ag Add Forests and Ag Subgroup reports to CEOS Plenary as part of the GEO session (reporting on GEO Flagship contributions) SEC Funding Total SEC support estimated at 1.0 FTE + travel (~$150K $US per year) CEOS-SEO (NASA) and ESA are evaluating a plan to support the SEC for 2 years. A decision is expected by the 2018 CEOS Plenary. Additional or future funding support will be explored with JAXA, USGS, CSIRO, NOAA & other interested space agencies

16 Timeline SIT-TW (September 2018)
Present proposal for review and comment Plenary (October 2018) Request annual renewals for GEOGLAM and SDCG for GFOI Review proposal and prepare for a decision to merge groups into LSI-VC with an updated LSI-VC Terms of Reference to follow SIT-34 (April 2019) Present a new LSI-VC Terms of Reference for review Plenary (October 2019) Final decision


Download ppt "CEOS Ad hoc Teams Lifecycle & Processes"

Similar presentations


Ads by Google