1 Health Sector

2 Update Planning Stage 176 189 8 Under Construction 79 80* 1.26
Total to be Reconstructed 307 Target for & /293 (95.43%) 237/307 (100%) Stage Previous Present Progress % Planning Stage 176 189 8 Under Construction 79 80* 1.26 Completed 38 Total 293 307 5.13 Prefab Facilities 137 * BHU Reshiyan by PRCS under construction Forecast (July 2008) = Expected completion – 13 HF (4 RHC + 9 BHU)

3 Construction Status - District Wise
Prefab Planning Construction Stage Completed Total Est. Budget* D&S GoP Mansehra 27 29 20 9 5 43 2600 Battagram 17 14 2 12 21 35 1215 Shangla 3 16 1 15 23 1165 Kohistan 22 640 Abbottabad 19 24 1110 Muzaffarabad 41 32 13 61 2910 Neelum 730 Poonch 18 37 1510 Bagh 26 46 2080 137 189 77 112* 80 38 307 13960 %age 61.56 40.7 59.2 26.05 12.37 *Rs. in Million

4 Construction Status GoP - District Wise
Total Planning Construction Stage Completed %age PC-I Sury Desg. Tot Mansehra 9 5 3 Battagram 12 11 6 Shangla 19 18 1 15 2 + 1 15.78 Kohistan 23 8 22 4.34 Abbottabad 17 2 16 5.88 Muzaffarabad 24 20.83 Neelum 13 Poonch 4 25 Bagh 124 96/78 62/51 23/17 112 11 (2 + 9*) 8.87 85.71 55.35 20.53 90.32 0.80 * 9 WHO prefab completed

5 Construction Status D&S- District Wise
Total Planning Construction Stage Completed % age Mansehra 34 20 5 7 + 2 26.47 Battagram 23 2 21 Shangla 4 1 50 Kohistan Abbottabad 7 3 28.57 Muzaffarabad 37 13 12 + 1 9 + 2 29.72 Neelum Poonch 33 15 17 3.03 Bagh 43 18 4.65 183 77 79 27 (18 + 9*) 14.75 %age 42.07 43.16 * 9 WHO prefab completed