Presentation is loading. Please wait.

Presentation is loading. Please wait.

BROCTON CENTRAL SCHOOL DISTRICT PLANNED FACILITIES RECONSTRUCTION September 15, 2011.

Similar presentations


Presentation on theme: "BROCTON CENTRAL SCHOOL DISTRICT PLANNED FACILITIES RECONSTRUCTION September 15, 2011."— Presentation transcript:

1 BROCTON CENTRAL SCHOOL DISTRICT PLANNED FACILITIES RECONSTRUCTION September 15, 2011

2

3

4 Tower Reconstruction

5 Cafeteria Dining Area Plan

6 Cafeteria Dining Area

7 Fitness Center Plan

8 Fitness Center

9 Instrumental Music Suite Plan

10 Instrumental Music Suite

11 High School Office Plan

12 Guidance Office Plan

13 Nurses Suite Plan

14 Buildings & Grounds Suite Plan

15 Natatorium Improvement Plan New Ceramic Tile Pool Surface New Lighting New Perimeter Gutter System New Sonar Detection System New Accessible Ramp Entry Revise Existing Pool Depths Various Mechanical Upgrades

16 Questions?


Download ppt "BROCTON CENTRAL SCHOOL DISTRICT PLANNED FACILITIES RECONSTRUCTION September 15, 2011."

Similar presentations


Ads by Google