Download presentation
Presentation is loading. Please wait.
Published byElinor York Modified over 6 years ago
1
PULSE PROTOCOL – P3 GROUP NUMBER: DELIVERABLES DELIVERABLES FOR P3
Deliverables from P2 fixed? Time study and clarification of problem Data is analysed according to one or more of the following parameters/costs: Cycle times and bottlenecks Losses – adjustments and cassation Change overs Reconfiguring times and maintenance Overall equipment efficiency OEE Estimation of disturbance costs and economic potential of improvements General problem consequences COOPERATION WITHIN THE GROUP RELATION WITH THE COMPANY MISC. (COMMENTS, PROBLEMS AND CHALLENGES) PROJECT REPORT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.