Download presentation
Presentation is loading. Please wait.
1
… BY BENGAL TIGER LINE 1986 – 2015 & Onward
A TIGER’S TALE … BY BENGAL TIGER LINE 1986 – 2015 & Onward
2
2ND EAST COAST MARITIME FORUM 2015
28 YEARS OF MARRIAGE … A long walk down the isle
3
SUCCESS IS IN PATIENCE Port Throughput Growth – Average per Annum TEU
YEAR
4
EAST COAST PORT CAPACITY/THROUGHPUT
Terminal Current Capacity / Annum in TEUs 2014 Figures in TEUs DPW – Chennai 1.6 Million 0.8 Million PSA – Chennai 1.5 Million 0.72 Million KPCT – Krishnapatnam 1.2 Million 0.08 Million KICT – Kattupali 0.03 Million VCTPL – Visakhapatnam 0.5 Million 0.25 Million TOTAL 6 Million 1.88 Million
5
IMPROVEMENT WISH LIST Review of Port Charges
6
IMPROVEMENT WISH LIST Review of Port Charges
Nil Berthing Delays / Night Navigation Off Dock CFSs - Long Term Solution New Port Development
7
THE FUTURE LIES IN OUR HANDS
3 Mobile Harbour Crane Operation BTL / JV -13 Vessels / 26 Calls per month Commitment Growth in volumes- driven by Trade investment
8
“The future depends on what you do today”
… Mahatma Gandhi THANKS ! EXIM The Tiger Line… The Direct Line
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.