Presentation is loading. Please wait.

Presentation is loading. Please wait.

P08424 Residential Energy Savings

Similar presentations


Presentation on theme: "P08424 Residential Energy Savings"— Presentation transcript:

1 P08424 Residential Energy Savings
Sponsor – Facilities Management Services Robert Underhill: Project Manager Aaron Resetarits: Component Analysis/ Implementation Feasibility Bill Jamieson: Building System Analysis/ Component Analysis Swathi Paruchuri: Statistical Analysis/ Human Behavior Kris Laera: Statistical Analysis/ Engineering Economics Jeremy Barczak: Coding/ Data Acquisition

2 Key High level Customer Needs
Project Description Reduce energy consumption on Residential side of The RIT campus Market - Students living in the dorms Key High level Customer Needs Save RIT money Reduce Energy consumption Increase student awareness Characterize and explain student energy usage Engineering Specs Payback < 3 years >$24,000/yr 5% Reduction with modifiable suggestions >15% reduction with competition Involve 3380 students in competition to reduce their energy Breakdown (%)of the typical student’s energy based on 3.3 kwh total

3 System Architecture Overview
Reduce Energy Energy Audit Grass Root Campaign Website Competition Hallway Lighting Incandescent Conversion

4 Results from Audit

5 Website Architecture User Website Home External Links Dorm Groups
Weekly/Monthly Individual Contribution Weekly/Monthly Suggestions for Reducing Energy

6 Website Design

7 Competition Check Baseline Energy consumption Get student
organization support Advertise for Competition Initiate competition Website functioning 2 week competition Compare to baseline to determine winner Post-Competition Analysis Have Party for winners!

8 Hallway Timers Establish Kwh Baseline (2 weeks)
FMS buys Hallway Timers Install Hallway Timer allowing lights on for 16hrs/day Monitor % Decrease (1 week) Compare to Original goal Assess performance

9 Incandescent Conversion
Establish Kwh Baseline (2 weeks) Inform Students Count number Of incandescent bulbs Buy bulbs Get students to Install new Fluorescent bulbs Monitor % Decrease (1 week) Compare to Original goal Assess performance

10 Risks and Strategy for Mitigation

11 Current State of Design
Audit (complete) and Suggestions meet all customer needs Website in development On target to meet $5000 budget Likely to spend ~$3000 Schedule: On time Significant confidence in Incandescent Trade in suggestion Moderate confidence in Hallway Timer Suggestion Moderate confidence in Grass-Roots Campaign Mitigations: Suggestion Feasibility Testing Competition Advertising Coordination with and Support from Engineers for a Sustainable World, SWE, ResLife, FMS

12 Product Development Process Phase
Current Phase of Development

13 MSD II Project Schedule Milestones
Week 1 Install meters, begin control readings Week 2 Complete 1 full week of control, Install hallway timers Week 3 1 week of timer testing, provide students with fluorescent bulbs Week 4 2 weeks of bulb replacement testing, inform RA's of competition Week 5 2 weeks of bulb replacement testing, inform students of competition Week 6 Initiate competition: run for two weeks, revise suggestions Week 7 Second week of competition, complete analysis of suggestion performance Week 8 Post-competition analysis, modify website as necessary Week 9 Post-competition analysis Week 10 Post-competition analysis, assemble test data into formal report Week 11 Provide FMS with detailed report of findings and proposed action


Download ppt "P08424 Residential Energy Savings"

Similar presentations


Ads by Google