1 ARIES Pathways Program
Industrial Advisory Committee Preliminary Comments R W Kuhr June 14

2 Technology Assessment Criteria
Critical flaws Fundamental process Materials Technology development needs Data needs/cost Confidence in design basis Major risks Implementation Operation

3 EPRI Criteria Economics Public Acceptance Regulatory Simplicity
Need to prioritize Choices determined by primary issues

4 Critical Flaws Fundamental Process Materials
Combination of operating conditions at design point demonstrated at ITER Large number of variants not demonstrated System control mechanisms are critical May not be economic to obtain complete design data Materials Component life central concern New material compositions need long term data which may not be available to support design Lifetime after radiation exposure uncertain

5 Technology Development
Relies on large scale, expensive facilities Limited scope of data in relevant conditions Long list of data needs covered by speculative relationships Difficult learning period from plant to plant experience (long lead times, $$$)

6 Major Risks Implementation Regulatory Public Acceptance/risk taking
Private participation/risk taking Supply chain Completion Cost/schedule growth

7 Major Risks Operation Capacity Forced outages Scheduled outages
Maintenance/repair cost Regulatory changes Early end of life End of life costs