PyNe -- Vienna WP 2H Biorefinery April 23, 2008.

Similar presentations


Presentation on theme: "PyNe -- Vienna WP 2H Biorefinery April 23, 2008."— Presentation transcript:

1 PyNe -- Vienna WP 2H Biorefinery April 23, 2008

2 Progress in Biorefinery Case Studies
Biorefinery concepts TEA for Biorefineries 2

3 TEA of Pyrolysis Biorefinery
What process concept (or concepts?) Single concept in depth, or Comparison of several concepts Technical or Technoeconomic Detailed mass and energy balance only, or M&E balance to allow capital & operating cost estimate What methods? What level of detail? 3

4 Summary Numerous opportunities involving:
incorporation into sugar biorefinery incorporation into a petroleum refinery stand-alone with chemical, fuel, and power production incorporation into a gasification and synthesis plant Pyrolysis demonstration will lead to biorefinery Product separation and recovery is a major hurdle Finding the right niche is key 4

5 Biorefinery Concepts to be Evaluated
JR - Pyrolysis + CHP stand-alone (base case) PNNL - Distributed pyrolysis to central refinery for upgrading and integration Aston – Speciality chemicals and fuels IWC – Pre-separation concept and pyrolyse products (lignin), maximise by-products and chemicals from the process, particularly phenols FZK – Bio-oil/char slurry gasification + synthesis BTG – Direct gasification of bio-oil in existing gasifier + synthesis 5

6 6