Download presentation
Presentation is loading. Please wait.
1
doc.: IEEE 802.15-<doc#>
May 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Closing Report] Date Submitted: [May 17, 2007 ] Source: [Myung Lee] Company [CUNY] Address [Dept of EE, CUNY, 140th St. & Convent Ave, NY, NY 10031, USA] Voice:[ ], FAX: [ ], Re: [.] Abstract: [Closing Report for the TG5 Interim Session in Montreal, Canada] Purpose: [To report the activities of the Task Group 5] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Myung Lee, CUNY <author>, <company>
2
May 2007 TG5 WPAN Mesh May 17, 2007, Montreal, Canada Closing Report Meeting Objectives Technical Presentation Editing Draft Candidate Election of an Editor Project plan Discussion Myung Lee, CUNY
3
May 2007 Two Presentations Low Power Aspect of WPAN Mesh (Doc r0) by Changsub Shin. QoS for IEEE Wireless PAN Mesh Networks (Doc r0) by Ho-in Jeon. Myung Lee, CUNY
4
Draft editing Six sessions devoted for editing.
May 2007 Draft editing Six sessions devoted for editing. Reviewed the contribution on QoS mechanism for High Rate by SH Rhee, YA Jeon, SS Choi. Reviewed the contribution on Reliable Broadcasting by Sungrae Cho. IH Lee Reviewed the comments made by Hakyung Jung, Rui Zhang, Allan Zhu. Discussed the comments and made recommendations for editor and the authors Myung Lee, CUNY
5
Until July Meeting Bi-Weekly Teleconferencing
May 2007 Until July Meeting Bi-Weekly Teleconferencing All draft completed and integrated (HR and LR) by the first teleconf on May AM EST. May 30, June 13, June 27, July 11 Informal Comment Request from TG5 members Draft and comment form sent out by June 6, 2007 Comment by June 25, 2007 to Chair Vice Chair Editor Report Initial comment statistics at June 27 teleconferencing Resolution for Informal comments By July 16, 2007 At Plenary in July 15-20 Resolve all comments into the documents TG5 Vote for WG Letter Ballot WG Letter Ballot July 23, 2007 (?) August 21, 2007 (30 Days)(?) Myung Lee, CUNY
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.