Download presentation
Presentation is loading. Please wait.
1
Timetable Process Quality PCS User Group
12 September 2018
2
KPI 3.3.1 Compliance with the draft offer deadline
Sum Share Share in 2017 Compliance with the draft offer deadline Observation phase 2070 2083 71.93% 82.63% Rejected 13 Non-compliance with the draft offer deadline Path Elaboration phase 686 813 28.07% 17.36% Partial Harmonisation 127 Total number of dossiers 2896
3
Touched dossiers in Frozen Zone
Dossiers total reached Observations 2799 Dossiers touched 164 Dossiers untouched 2635
4
KPI 3.3.2 Compliance with the final offer deadline (unconfirmed)
Sum Share Share in 2017 Compliance with the final offer deadline Active Timetable 10 1225 42.34% 75.26% Final offer 1169 Dossier rejected 46 Non-compliance with the final offer deadline Post-processing 1102 1668 57.66% 24.74% Observations 166 Path Elaboration 39 Partial Harmonisation 361 Total number of dossiers 2893
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.