Download presentation
Presentation is loading. Please wait.
Published byΕυθαλία Φιλιππίδης Modified over 6 years ago
1
Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB Contact: Yoshinori ISHIKAWA Agenda Item: 5 .1 DETAILED WORKING MECHANISM ON DEVELOPING ITU-R RECS. M.1457 / M.2012 (IMT RADIO INTERFACE RECOMMENDATIONS) Yoshinori ISHIKAWA, Hitachi, Ltd. GSC-18 Meeting, July 2014, Sophia Antipolis, France
2
Current Structure of Recs. M.1247 /M.2012
Recs. M.1457 / M.2012 contains hyperlinks of SDOs’ standards as: TS Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation This document describes the physical channels and modulation for E-UTRA. Transposing organization Document number Version Issued date Location ARIB ARIB STD-T 16 September ATIS ATIS.3GPP V 26 July CCSA CCSA-TSD-LTE 31 August ETSI ETSI TS 136 28 June TTA TTAT.3G (R ) 26 August TTC Not applicable Not applicable GSC-18, July 2014, Sophia Antipolis
3
GSC-18, 22-23 July 2014, Sophia Antipolis
Detailed mechanism Key concepts of this mechanism are: Key concepts of this mechanism are: GCS (Global Core Specification) : - “GCS” is the set of specifications that defines a single RIT, ans set of RIT, or a RIT within an SRIT GCS Proponent (Represent an industry, organization, etc.) : - Single entity or collective entity that provides a GCS as included in Recommendations - have legal authority to grant to ITU the legal usage rights Transposing Organizations : - Authorized by the GCS Proponents to produce transposed standards with legal authority to grant to ITU the legal usage rights GSC-18, July 2014, Sophia Antipolis
4
Typical procedure for updating recommendation
ITU-R Meeting Y-1 GCS Proponent / Transposing Organizations (T.O) Send liaison to GCS Proponents announcing update schedule Request for providing update information Meeting Y Answer whether they are willing to update Radio Interface Meeting Y+1 Review the updated RITs and capabilities Assess the evaluation results of updated RITs Revise Rec. based on GCS Proponents proposal Request T.O to provides hyperlinks Inform abstracts of updated RIT Meeting Y+2A / 2B Provides Updated GCS Proposed texts of Rec. T.O. List Self-evaluation Transpose GCS to its Standards Provides hyperlinks Finalize Recommendation with T.O’s hyperlink
5
Typical procedure for updating recommendation
GCS Proponents & Transposing Organizations of current IMT-Advanced RITs LTE-Advanced GCS Proponent: 3GPP OPs (ARIB, ATIS, CCSA, ETSI, TTA & TTC) Transposing Organizations: ARIB, ATIS, CCSA, ETSI, TTA & TTC WirelessMAN-Advanced IEEE ARIB, IEEE, ITRI, TTA & WiMAX Forum GSC-18, July 2014, Sophia Antipolis
6
Merits of this Mechanism
Results from above mechanisms: Typically 5 ITU-R WP 5D meetings are required for updating Recommendation. (2 year cycles) It is a almost same duration for GCS Proponents to update their GCS Smooth introduction to the market -> GCSs are quickly transposed into National / Regional Standards and readers of the recommendation can easily find those Similar Recommendation structure is also employed in Rec. ITU-R M.1801 (BWA Radio Interface Recommendation) Recs. ITU-T Q.1741/1742 (IMT-2000 Core NW Recommendations) GSC-18, July 2014, Sophia Antipolis
7
GSC-18, 22-23 July 2014, Sophia Antipolis
Supplementary Slides GSC-18, July 2014, Sophia Antipolis
8
GSC-18, 22-23 July 2014, Sophia Antipolis
SUPPLEMENTARY SLIDES Deliverables of mentioned working mechanism on Rec. M.2012 ½ Vision /Framework of IMT : Rec. ITU-R M.1645 Requirements - Spectrum requirements are based on Rec. ITU-R M.1036 - Service requirements are based on Rec. ITU-R M.1822 - Technology requirements are described in Rep. ITU-R M.2134 (e.g. Cell Spectral efficiency, VoIP Capacity, Latency, Mobility, etc.) Evaluation methods : Rep. ITU-R M Submission templates : Rep. ITU-R M.2133 GSC-18, July 2014, Sophia Antipolis
9
GSC-18, 22-23 July 2014, Sophia Antipolis
SUPPLEMENTARY SLIDES Deliverables of mentioned working mechanism on Rec. M /2 Proposal from EOs for IMT-Advanced RIT : IMT-ADV/4 thru 9 ( xx : 4 thru 9) Individual Evaluation reports : IMT-ADV/10 thru 23 ( xx : 10 thru 23) Evaluation results and Results of Consensus Building : Rep. ITU-R M.2198 Updating procedure and example schedule : IMT-ADV/25 (Procedures) and 26 /28 (Schedules) ( xx : 25, 26, 28) GSC-18, July 2014, Sophia Antipolis
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.