1 75TH Civil Engineer Group
FY19 Program Overview Presented to the SAME Great Basin Post 11 Oct 2018 BE AMERICA’S BEST

2 Agenda Geographic Responsibility Operations Environmental Engineering
7 5 T H CIVIL ENGINEER GROUP Geographic Responsibility Operations Environmental Engineering BE AMERICA’S BEST

3 Geographic Responsibility
7 5 T H CIVIL ENGINEER GROUP BE AMERICA’S BEST

4 Operations (75 CES) Service Contracts Commodities Utilities IDIQ
7 5 T H CIVIL ENGINEER GROUP Service Contracts Commodities Utilities IDIQ BE AMERICA’S BEST

5 CES Service Contract Requirements
7 5 T H CIVIL ENGINEER GROUP Program: Service Contracts (9 Contracts) Scope: Custodial, Refuse, Grounds, Cranes/Hoists, Elevators, Porta-Potties, Snow Removal, Lab Equipment, Hoods/Ducts Budget: Exceeds $40 million POC: Rodney Sanders, 75 CES, (801) Acquisition Strategy: Competitive bid every 3-5 years 1 year + option years Small Business BE AMERICA’S BEST

6 CES Projected Timetables Service Contracts
7 5 T H CIVIL ENGINEER GROUP Program: Elevator Maintenance 3 Year Contract - Awarded 28 September 2016 Program: Refuse 5 year Contract - Awarded 1 April 2016 Program: Portable Toilets 5 Year BPA Contract - Awarded 1 April 2016 Program: Cranes and Hoists 3 Year Contract – Awarded 29 September 2017 Program: Grounds Maintenance 5 year Contract – Will award soon in 2018 BE AMERICA’S BEST

7 CES Commodities Requirements
7 5 T H CIVIL ENGINEER GROUP Program: Commodity Purchasing Scope: Shop materials and tools (benchstock), road salt and deicers, IWTP Chemicals, Boiler Chemicals, Electrical Parts, Asphalt/Concrete Budget: $5 million POC: Chad Dellamore (801) , (Logistics) Acquisition Strategy: Competitive, Government Purchase Card, Blanket Purchase Agreement, GSA, Prime Vendor BE AMERICA’S BEST

8 CES IDIQ Requirements 7 5 T H CIVIL ENGINEER GROUP Program: Indefinite Delivery Indefinite Quantity (ID/IQ) Contracts Scope: Pavements, Fence, Carpet, Paint, Roofs, Epoxy Floor Coating, SABER Budget: All Contracts have established ceiling limits POC: Each contract has a separate contract manager Acquisition Strategy: Competitive bid every 5 years •1 year + 4 option years Task based contract BE AMERICA’S BEST

9 CES IDIQ‘s 7 5 T H CIVIL ENGINEER GROUP
Program: Paint IDIQ 5 Year 8(a) Direct Award – 29 September 2017 Program: Roof IDIQ (built-up/metal) IDIQ 5 Year Contract Awarded – 30 September 2016 Roofing outside of the AF Enterprise Contract Program: Carpet IDIQ 5 Year Contract Awarded – 17 September 2018 Program: Epoxy Coating IDIQ 5 Year Contract Awarded – 3 July 2018 BE AMERICA’S BEST

10 Contracts – SABER SABER Multi Award Construction Contract
7 5 T H CIVIL ENGINEER GROUP SABER Multi Award Construction Contract Scope: Construction IDIQ -- 5 year contract – no option years Awarded: 30 September 2016 Specifics $150M total ceiling Task orders competed between contractors Contractors: Farah, Rio Vista, W4-DMS (JV) SABER: Simplified Acquisition of Base Engineering Requirements BE AMERICA’S BEST

11 Contracts – Pavements Multi Award Pavements Contract
7 5 T H CIVIL ENGINEER GROUP Multi Award Pavements Contract Scope: Asphalt and Concrete Paving IDIQ – 5 Year Contract – no option years Awarded: 30 January 2018 Specifics $85M total ceiling Task orders competed between contractors Contractors: Mountain West Precast, Consolidated, Brinkerhoff BE AMERICA’S BEST

12 Environmental (75 CEG/CEIE) 7 5 T H CIVIL ENGINEER GROUP
EQ Program Scope EQ Contracts Restoration Contracts BE AMERICA’S BEST

13 EQ Functional Responsibilities 7 5 T H CIVIL ENGINEER GROUP
 Hazardous Waste  Solid Waste  Qualified Recycling  Air Quality  Hazardous Materials  Water Quality  Environmental Impact Analysis  Storage Tanks  Cultural Resources  Natural Resources  Pollution Prevention  Env. Mgt. System  Emergency Planning  Toxics BE AMERICA’S BEST

14 EQ Program Scope 7 5 T H CIVIL ENGINEER GROUP
> 250 HW generation sites > 4000 air emission sites 72 HazMat Distribution Support Centers > 5 million lbs/yr recycled (QRP) > 700 archeological sites on UTTR Water Quality – Including storm water, industrial waste water, and retention ponds 700 acre/yr habitat restoration at UTTR 1500 acres of additional fire breaks to protect mission and wildlife ~1500 NEPA/EIAP reviews 17 regulated USTs, 250 ASTs 22% of AF total TRI emissions (EPCRA) P2: many projects, many partners BE AMERICA’S BEST

15 Contracts Background 7 5 T H CIVIL ENGINEER GROUP
 All Air Force environmental funding now centrally managed by AFCEC  Lead contracting agency is 772nd ESS 772 ESS uses USACE & GSA for additional capacity Mountain Home, Fairchild, Malmstrom  To gain efficiencies through volume purchasing and to reduce the administrative burden of managing multiple contracts for various environmental services, AFCEC is procuring multi-year, multi-media contracts for environmental services at its installations. BE AMERICA’S BEST

16 FY17-21 Hill BIEST 7 5 T H CIVIL ENGINEER GROUP
 Acquisition Agency: Sacramento COE  POC: Scott Bonner, Contract Specialist Phone:  Awarded: March 2017  1st option year March 2018  2nd option year March 2019 BIEST = Base Integrated Environmental Support Task BE AMERICA’S BEST

17 Hill-UTTR Environmental Services Contract (BIEST)
7 5 T H CIVIL ENGINEER GROUP  SCOPE: Hazardous waste mgmt., spill response, water quality support , NEPA support, environmental management systems, hazardous materials management, air quality support  TERM: Basic + 4 Option Yrs (Apr 2017-Mar 2021)  AGENCY: USACE  PRIME: CH2M Hill (now Jacobs)  SUBs: Cardno, SES, Stantec, EnviroCare  AMOUNT: ~$6M annually BE AMERICA’S BEST

18 Hill Performance-Based Remediation Contract
7 5 T H CIVIL ENGINEER GROUP  SCOPE: Full range of remediation activities supporting progress to achieve performance objectives at 36 Installation Restoration Program sites, 3 Military Munitions Response Program Sites & vapor intrusion program.  TERM: Basic + 7 Option Yrs (Sep 2012-Aug 2020)  AGENCY: 772 ESS  PRIME: EA Engineering  AMOUNT: ~$70M over ten years BE AMERICA’S BEST

19 UTTR Performance-Based Remediation Contract
7 5 T H CIVIL ENGINEER GROUP  SCOPE: Full range of environmental remediation activities to support progress to site closeout at 18 Installation Restoration Program sites and 15 Munitions Response Areas.  TERM: Basic + 9 Option Yrs (Jun 2013-May 2023)  AGENCY: USACE  PRIME: URS (now AECOM)  AMOUNT: ~$15M over ten years BE AMERICA’S BEST

20 Engineering Division 75 CEG/CEN
7 5 T H CIVIL ENGINEER GROUP Contracts A & E Services MACC III Project Outlook SRM Projects Depot Projects BE AMERICA’S BEST

21 Contracts - A&E Services
7 5 T H CIVIL ENGINEER GROUP Architecture & Engineering Services (A&E) Scope: A&E Services Basic + 4 option years (Expired Jan 2018) - $10M Design, Construction Management, Special Studies, Master Planning Task orders selected on technical qualifications Old Contract—6 Firms: Architectural Nexus, AJC, Baker, Design West, GBS, URS Renewal Anticipate advertisement on FedBizOps in Nov/Dec timeframe with award anticipated in Mar 2019 timeframe Ceiling will be increased significantly this time POC: All questions must be referred to the Contracting Officer Steven Kinkead, PZIOC, (801) BE AMERICA’S BEST

22 Contracts – MACC III 7 5 T H CIVIL ENGINEER GROUP Design/Build Multi Award Construction Contract (MACC) Scope: Construction IDIQ -- five year contract – no option years Design/Build (w/ potential for Best Value) Bid/Build Specifics $150M total ceiling Contract Period: Sep 2016 – Sep 2021 6 Contractors: E-Corp, Gideon, HHI, RHI, Rio Vista, Sahara Palms Task orders competed between contractors BE AMERICA’S BEST

23 Centralized O&M Funding
7 5 T H CIVIL ENGINEER GROUP O&M funding (known to many as SRM) centralized at AF Installation & Mission Support Center (AFIMSC) Operationally managed by AFCEC (now aligned under AFIMSC) Focus funding eliminated – Energy, Demo, Dorm compete on merits Large projects (>$3M) – more use of DBB less of DB Funding model based on risk to the mission – probability & consequence of failure Funding/project execution timelines Three year rolling budget – currently finalizing FY20-22 request Funding approval issued in Apr/May each year FY20 DB or DBB w/ design complete, will received funding decision in May 2019 FY21 DBB w/ design pending will receive funding decision in May for design and May 2020 for construction BE AMERICA’S BEST

24 Project Description/Title
FY19 Projects Centrally Funded Repair & Modernization Projects Project Number Project Description/Title Range ($K) 170033 Repair Fire Suppression at Air Traffic Control Tower 100035 Repair Transient Apron 150024 ADAL Fire Station Bldg 4301 150030 Repair Roof on Bays F & G Bldg 845 050051 Repair Parking Lot 1 150112 Repair Southgate Avenue BE AMERICA’S BEST

25 FY19 Projects Maintenance Depot (OO-ALC) Funded Projects
No project funding determinations to-date Anticipate $10-30M in projects to be executed through MACC III and SABER w/ some design projects Also executing major Bldg 225 Roof Repair project through the Corps of Engineers BE AMERICA’S BEST

26 Navy START Treaty Facilities – UTTR –
7 5 T H CIVIL ENGINEER GROUP Navy Missile Motor Destruction Program under START ~ $100M MILCON effort Rail spur from Lakeside to UTTR – Oasis Complex Off-loading/Storage Facilities Execution through USACE BE AMERICA’S BEST

27 Questions? 7 5 T H CIVIL ENGINEER GROUP BE AMERICA’S BEST