1 Settlement system under Open Access

2 Terms & meaning Open Access – Non-discriminatory Access to Tr. System
Nodal RLDC – RLDC where the Drawee utility is located Applicant - Who applies for OA Customer - Who is granted OA

3 Category of OA Tx. Advance - Reservation of Cap. up to a max. of 3 months (for each month) First Come First Serve – Reservation of Cap. if any, after allotment to Adv. Applicants (upto a max of next 3 months) Day Ahead/ Reservation of Cap. On Day ahead/ Contingency - Reservation of Cap. On Day ahead/ same day basis, if any after allotment to Day Ahead

4 Philosophy To avoid pan-caking of charges
Reduce cost of power/ burden on end user Encourage transactions Reasonable levy of charges for the usage Fair compensation to the Long term user of Tr. System Fair compensation to the Owner of Tr. System Reasonable charges to RLDC/SLDCs

5 Processing of Advance Applications for next 3 months
10/5/1 day (17.30hrs) prior in a month for 2nd/3rd/4th month Dead Line for Receipt of Application Request for Consent from SLDC/RLDC Next Day to due date(12.00hrs) Issue of Consent by SLDC/RLDC SAME DAY 20.00HRS Next day 12.00hrs Request Applicant for a revised Tr. Cap. Next day 12.00hrs WITHIN 5 DAYS No Check for any Tr. Congestion ? Yes Approval Still Tr. Congestion ? Next day 11.00hrs No Revised MW/Duration by Applicant Yes E-bidding 4th day after due date 3 working days after issue. Commence- ment of Tx. Approval Payment of STOA ch. WITHIN 5 DAYS

6 Non-utilisation of Reserved Tr. Capacity
Non-utilization (full/substantial) by Customer Suo-Motu by Nodal RLDC Intimation by Customer To Nodal RLDC Notice to Customer 1 day Revised Approval Forfeit of STOA ch. For 2 days/ balance period of Tx. Reallottment to Another Applicant

7 Curtailment in case of Tr. constraint
No No refund Yes Refund Pro-rata Charges of Curtailed Capacity

8 Settlement of Energy Charges
Trader Energy Charges Seller Buyer Trader Trader’s commission charges

9 Settlement of STOA Charges
Nodal RLDC CTU Application fee STU/ licensee charges All STUs involved 75% to Long term Customers Nodal RLDC ISTS+ IR link charges CTU 25%of ISTS to CTU for Augmentation Is OA Granted? Yes Operating Charges For RLDCs All RLDCs involved Operating Charges For SLDCs All SLDCs involved

10 Bilateral Transaction charges
1) Application fee Rs.5000 per each transaction (Non-refundable) Along with application for Adv/FCFS Within 3 working days for DA/Contingency 2) Transmission Charges a) Regional/CTU Tr. Ch. Rs.80/MWh (ps 8/u) for within region Rs.160/MWh (ps 16/u) for b/w adjoining regions Rs.240/MWh (ps 24/u) for wheeling by one or more regions b) STU/SEB/Tr. Licencee Tr. Ch. To be paid only if the Tx is not internalised. as specified by SERC or Rs.80/MWh (ps 8/u)

11 Bilateral Transaction charges
Operating Charges Rs. 2000/day for each Tx. For each RLDC involved For each SLDC involved (only if not internalised)

12 Internalisation Mostly in case where unbundling has not take place ( ex. SEBs, vertically integrated utilities etc.) For own use, Tx is internalised For use by a third party, Not internalised. If internalised Certificate to be submitted No transmission charges for concerned STU/Tr. Licencee No operating charges for concerned SLDC

13 Mode of payment to Nodal RLDC
Bank draft/ at par cheque/ electronic money transfer No outstation cheque Within 3 working days Transaction-wise payment details to be submitted in Format -VII

14 Default 0.04% simple interest for each day of delay/default
Nodal RLDC may not schedule the Transaction Entertain further application in future till dues are cleared

15 Other Charges 1) Energy charges
As negotiated mutually based on market conditions, demand-supply position Rate need not be disclosed to RLDCs To be directly settled between buyer /seller Trader to collect and disburse May be influenced by losses, trading marigin etc. Charged on energy as reflected in monthly REA REA to furnish periphery, IR periphery, Peak/offpeak , Discomwise etc.

16 Other Charges Trading marigin @4ps/u if cost of power =< ps350/u

17 Revision in OA schedule
Only for Advance/ FCFS Min. 2 days notice/request excluding the day of revision Scheduled OA charges for 2 days to be foregone OA charges corresponding to Downward revision to be refunded To be reconciled for previous month and refunded within 15 days of current month

18 Disbursement Nodal RLDC to Reconcile all charges for previous month
Disburse to all stake holders within 10 days in current month Disbursement of CTU charges to concerned RTS STU charges to concerned STU/SEB Operating charges to concerned RLDCs Operating charges to concerned SLDCs

19 Disbursement RTS to retain 25% of CTU transmission charges
Balance 75% to give credit in their Transmission Bill (as per weighted Average entitlement to each Long term customer)

20 Refund When to refund ? A) Incase of curtailment due to transmission constraints B) Incase of revision in Schedule How much to refund ? A) Pro-rata charges for the energy curtailed B) Retain a minimum of five days of OA charges(Tr and Op ch.) and Refund balance OA charges (transmission charges and operating charges) for the reduction in Energy Deadline for Refund : Within 15 days of current month for Tx curtalied/revised in previous month

21 Indemnification No responsibility to Nodal RLDC In case of Default
Indemnify RLDC/ SLDC harmless from All damages/ losses/ claims/ costs etc.

22 Internalization As Declared in the Application
Buyer/Seller is said to be internalised : If they are Directly connected to CTU (ex. SEBs, CGS etc.) In case of an Embedded Customer where The Connected STU is not yet unbundled In case of organizations where full commercial separation is not in place When STU charges and losses are not published If the power purchase rate includes the Tr. Ch. And Losses Implications if internalised : No Transmission charges No Scheduling/ operating charges No Normative Losses

23 Non-Internalization As Declared in the Application
Buyer/Seller is said to be Not Internalised If Buyer/Seller is embedded customer (CPP, IPP, HT consumer etc.) in a not-yet unbundled SEB In an unbundled state setup case If Buyer/Seller is a Power purchase centre, Discom in an unbundled setup Implications if Not internalised : Transmission charges to be paid Scheduling/ operating charges to be borne Normative Losses applicable

24 Normative Losses for Scheduling STOA
AP: 4.2% KPTCL: 4.06% DVC: 2.82% WB: 3.9% DTL: 1.5% CSEB:4.03% MP: 4.9% Maharashtra: 4.85% OPTCL:4.5% Rajasthan: 4.4% only for Embedded KSEB: 0.75% TNEB: 1.75%

25 KAYAMKULAM CCGT(NTPC)
STOA OF KSEB(KYCPP) - TNEB HRS – 2400 HRS 150MW AT KYCPP EXBUS POINT for 31 days CUSTOMER: TNEB TRADER: - INJECTING UTILITY : KYCPP, (KSEB) (Not Internalised) KERALA DRAWEE UTILITY TNEB (Internalised) TAMILNADU CAPACITY APPROVED MW DAILY PERIOD HRS DATE OF COMMENCEMENT DATE OF EXPIRY KAYAMKULAM CCGT(NTPC)

26 KAYAMKULAM CCGT(NTPC)
STOA OF KSEB(KYCPP) - TNEB HRS – 2400 HRS 150MW AT KYCPP EXBUS POINT for 31 days FROM TO , THROUGHOUT THE DAY APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION SCHEDULING CHARGES PER DAY Rs 2000 FOR SRLDC Rs 2000 FOR KSEB KERALA TAMILNADU TRANSMISSION CHARGES PER MW PER DAY Rs 30/ MWh FOR CTU-SR Rs 30/ MWh FOR KERALA TOTAL TRANSMISSION CHARGE PER UNIT 6.12/. Ps KAYAMKULAM CCGT(NTPC) MORE DETAILS

27 HVDC BACK TO BACK AT GAZUWAKA IN SR
STOA OF WBSEB - PCKL (0000 – & – 2400 HRS) 50 MW AT INJECTION POINT FOR KAR WB SR CTU HVDC BACK TO BACK AT GAZUWAKA IN SR ER CUSTOMER: NVVN TRADER: NVVN INJECTING UTILITY WBSEB (Not Internalised) DRAWEE UTILITY PCKL (Not Internalised) INTERVENING REGIONAL LINK ER-SR DAILY PERIOD & HRS CAPACITY APPROVED MW DATE OF COMMENCEMENT DATE OF EXPIRY

28 HVDC BACK TO BACK AT GAZUWAKA IN SR
STOA OF WBSEB - PCKL (0000 – & – 2400 HRS) 50 MW AT INJECTION POINT FOR EXPORT AT WB 50 MW LOSSES IN WB % AT ER- WB PERIPHERY MW WB LOSSES IN ER % ER AT ER-SR PERIPHERY MW HVDC BACK TO BACK AT GAZUWAKA IN SR LOSSES IN SR % SR CTU AT KPTCL PERIPHERY MW LOSSES IN KPTCL % KAR PCKL RECEIVES MW TOTAL LOSSES FOR TRANSACTION MW

29 STOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 HRS) 50 MW AT INJECTION POINT FOR 21.11.08
APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION SCHEDULING CHARGES PER DAY Rs 2000 FOR WBLDC Rs 2000 FOR ERLDC Rs 2000 FOR SRLDC Rs 2000 FOR Karnataka LDC WB ER TRANSMISSION CHARGES PER MWh PER DAY Rs 30/MWh FOR WBTCL Rs 30/MWh FOR CTU-ER Rs 30/MWh FOR CTU-SR Rs /MWh FOR KPTCL HVDC BACK TO BACK AT GAZUWAKA IN SR SR CTU KAR TOTAL TRANSMISSION CHARGE PER UNIT Ps/U

30 HVDC BACK TO BACK AT BHADRWATHI IN WR
MPTRADECO-APPCCB THROUGH LANCO (1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR CUSTOMER: LANCO TRADER: LANCO INJECTING UTILITY MPTRADECO (Not Internalised) DRAWEE UTILITY APPCC (Not Internalised) INTERVENING REGIONAL LINK WR-SR CAPACITY APPROVED MW DAILY PERIOD HRS DATE OF COMMENCEMENT DATE OF EXPIRY

31 HVDC BACK TO BACK AT BHADRWATHI IN WR
MPTRADECO-APPCCB THROUGH LANCO (1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR EXPORT AT MP MW LOSSES IN MP % AT MP PERIPHERY MW LOSSES IN WR % AT WR-SR PERIPHERY MW CTU LOSSES IN SR % AT SR-AP PERIPHERY MW LOSSES IN AP % APPCC RECIEVES MW TOTAL LOSSES FOR TRANSACTION MW

32 HVDC BACK TO BACK AT BHADRWATHI IN WR
MPTRADECO-APPCCB THROUGH LANCO (1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION SCHEDULING CHARGES PER DAY Rs 2000 FOR MP SLDC Rs 2000 FOR WRLDC Rs 2000 FOR SRLDC Rs 2000 FOR APLDC TRANSMISSION CHARGES PER MW PER DAY Rs. 30/MWh FOR MPTCL Rs 30/MWH FOR WR CTU Rs 30/MWH FOR SR CTU Rs 53.3/MWH FOR APTRANSCO TOTAL TRANSMISSION CHARGE PER UNIT Ps/U.

33 STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW FROM 0000 HRS – 2400 HRS FROM 09-11-08 TO 12-11-08
CUSTOMER: TATA AP KAR TRADER: TATA INJECTING UTILITY BANNARI AMMAN SUGARS (KPTCL) (Not Internalised) DRAWEE UTILITY APPCC (Not Internalised) INTERVENING REGION SR CAPACITY APPROVED MW DAILY PERIOD HRS – 2400 HRS DATE OF COMMENCEMENT DATE OF EXPIRY

34 STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW FROM 0000 HRS – 2400 HRS FROM 09-11-08 TO 12-11-08
EXPORT AT BANNARI 10 MW LOSSES IN KARNATAKA % AP KAR AT KPTCL PERIPHERY MW LOSSES IN SR % AT AP PERIPHERY MW LOSSES IN AP % AT AP PERIPHERY MW TOTAL LOSSES FOR TRANSACTION 11.56 MW

35 STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW FROM 0000 HRS – 2400 HRS FROM 09-11-08 TO 12-11-08
APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION AP KAR SCHEDULING CHARGES PER DAY Rs 2000 FOR KP LDC Rs 2000 FOR SRLDC Rs 2000 FOR AP LDC TRANSMISSION CHARGES PER MW PER DAY Rs / MWh FOR KPTCL Rs 30 / MWH FOR CTU-SR Rs 53.3 / MWH FOR APTRANSCO TOTAL TRANSMISSION CHARGE PER UNIT Ps./U

36 CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)
BACK

37 DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND HRS) 50 MW FROM to CUSTOMER: TATA HVDC BACK TO BACK AT VINDHYACHAL IN WR TRADER: TATA WB RAJASTHAN INJECTING UTILITY DVC (Not Internalised) DVC JAIPUR NR DRAWEE UTILITY JAIPUR (DISCOM) (Not Internalised) ER WR INTERVENING REGION SR & WR SR INTERVENING REGIONAL LINK : ER-SR SR-WR WR-NR HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING STATE TRANSMISSION UTILITY RRVPN CAPACITY APPROVED MW DAILY PERIOD & hrs HVDC BACK TO BACK AT GAZUWAKA IN SR DATE OF COMMENCEMENT DATE OF EXPIRY

38 DVC – Jaipur WHEEL THROUGH SR, WR (0000 HRS – 1700 HRS AND HRS) 50 MW FROM to EXPORT AT DVC 50 MW VINDHYACHAL HVDC & Gwalior-Agra LOSSES IN DVC % AT ER-SR PERIPHERY MW NR RAJASTHAN WB LOSSES IN ER % DVC AJMER AT ER-SR PERIPHERY MW LOSSES IN SR % ER AT SR-WR PERIPHERY MW WR LOSSES IN WR % SR AT WR-NR PERIPHERY MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN NR % AT NR-RAJ.PERIPHERY MW LOSSES IN RAJASTHAN % HVDC BACK TO BACK AT GAZUWAKA IN SR JAIPUR RECIEVES MW TOTAL LOSSES FOR TRANSACTION MW

39 DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND HRS) 50 MW FROM to HVDC BACK TO BACK AT VINDHYACHAL IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION RAJASTHAN NR DVC WB AJMER SCHEDULING CHARGES PER DAY Rs 3000 FOR ERLDC Rs 3000 FOR SRLDC Rs 3000 FOR WRLDC Rs 3000 FOR NRLDC Rs 2000 FOR RAJASTHAN ER WR HVDC BACK TO BACK AT BHADRWATHI IN WR SR HVDC BACK TO BACK AT GAZUWAKA IN SR

40 DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND HRS) 50 MW FROM to HVDC BACK TO BACK AT VINDHYACHAL IN WR TRANSMISSION CHARGES Rs./MW/Day Rs 647 FOR CTU-ER Rs 1909 FOR ER-SR LINK Rs 843 FOR CTU-SR Rs 1311 FOR SR-WR LINK Rs 357 FOR CTU-WR Rs 600 FOR WR-NR LINK Rs 594 FOR CTU-NR Rs 3159 FOR STU-RAJASTAN RAJASTHAN NR DVC WB AJMER ER WR HVDC BACK TO BACK AT BHADRWATHI IN WR TOTAL TRANSMISSION CHARGE PER UNIT Ps/U (AS PER PRESENT RATES 22.12Ps/U) SR HVDC BACK TO BACK AT GAZUWAKA IN SR

41 HVDC BACK TO BACK AT GAZUWAKA IN SR
Dadri URS Power– AP through ER (0000 HRS – 1700 HRS AND HRS) 50 MW on CUSTOMER: NVVN NR DADRI TRADER: NVVN INJECTING UTILITY DADRI (Internalised) WB AJMER ER DRAWEE UTILITY APPCC (Not Internalised) INTERVENING REGION ER AP INTERVENING STATE TRANSMISSION UTILITY APTRANSCO CAPACITY APPROVED MW HVDC BACK TO BACK AT GAZUWAKA IN SR DATE OF COMMENCEMENT DATE OF EXPIRY

42 HVDC BACK TO BACK AT GAZUWAKA IN SR
Dadri URS Power– AP through ER (0000 HRS – 1700 HRS AND HRS) 50 MW on EXPORT AT Dadri 50 MW NR LOSSES IN NR % DADRI AT NR-ER PERIPHERY MW WB LOSSES IN ER % AJMER ER AT ER-SR PERIPHERY MW LOSSES IN SR % AT CTU-AP PERIPHERY MW LOSSES IN AP % AP AT AP DISCOMS RECIEVE MW TOTAL LOSSES FOR TRANSACTION MW HVDC BACK TO BACK AT GAZUWAKA IN SR

43 TOTAL TRANSMISSION CHARGE PER UNIT HVDC BACK TO BACK AT GAZUWAKA IN SR
Dadri URS Power– AP through ER (0000 HRS – 1700 HRS AND HRS) 50 MW on APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION NR DADRI SCHEDULING CHARGES PER DAY Rs 2000 FOR NBLDC Rs 2000 FOR ERLDC Rs 2000 FOR SRLDC Rs 2000 FOR AP LDC WB WB AJMER ER ER TRANSMISSION CHARGES PER MWh PER DAY Rs 30/MWh FOR CTU-NR Rs 30/MWh FOR CTU-ER Rs 30/MWh FOR CTU-SR Rs 53.3/MWh FOR APTRANSCO AP TOTAL TRANSMISSION CHARGE PER UNIT 14.33 Ps/U HVDC BACK TO BACK AT GAZUWAKA IN SR