Download presentation
Presentation is loading. Please wait.
1
API Summer Standardization Conference
June 24th -28th, 2013
2
API SC-16 Task Group 2 Specification 16D Chair – Brian Wright
Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Chair – Brian Wright Co-Chair – Maynard Chance Currently on Second Edition published in June 2004 and reaffirmed June 2010. Document is currently under review. Target date for initial ballot is 4th Qtr. of 2013.
3
API SC-16 Task Group 2 Specification 16D Meetings held this year:
Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Meetings held this year: Winter Standards Conference Jan. 22nd 2013 June 5th Full Task Group Meeting Working group Meetings for Electrical/Software–Six meetings. Next full task group meeting is July 16th. Next Electrical/Software meeting is July 10th.
4
API SC-16 Task Group 2 Specification 16D Open Issues:
Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Open Issues: Finalize Accumulator FVR requirements based on worst well control scenario. Continue work on Electrical/Software sections. Incorporate SC18 welding gap analysis into document. Develop details required for secondary systems.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.