Download presentation
Presentation is loading. Please wait.
Published byFelicia Douglas Modified over 6 years ago
1
Air and Waste Management Association Energy Updates
Assistant Commissioner Paul Baldauf Air Quality, Energy and Sustainability November 16, 2018
2
New Jersey Electricity Generation by Fuel Type
TOTAL GENERATION YEAR 2017 1.6% 0.8% 0.2% 48% 45% 4.8% 2016 1.7% 0.7% 55% 38% 4.5% 2015 2.3% 0.5% 49% 44% 3.8% 2014 3.6% 0.9% 3.9% 2013 3.1% 1.0% 0.3% 42% 52% 2.0% 2012 2.9% 0.1% 51% 2011 6.4% 39% 1.2% Other Natural Gas Petroleum Coal Nuclear Renewable Source: EIA GENERATION FROM RENEWABLES YEAR Hydro Conventional Biomass Wind Solar Small-Scale Utility-Scale 2017 2.19% 0.03% 1.23% 1.54% 2016 2.15% 1.22% 0.01% 1.31% 2015 1.89% 1.24% 0.83% 2014 1.98% 1.44% 0.02% 0.74% 2013 0.67% 2012 1.48% 0.47% 2011 1.35% 0.04% 0.11% Source: EIA
3
Changing New Jersey Energy Landscape
Governor Murphy’s Administration has set the clean energy tone Executive Order 8 – Aggressive implementation of the 2010 Offshore Wind Economic Development Act to meet 3,500 MW by 2030. Executive Order 28 – Advance New Jersey’s clean energy economy through completion of a comprehensive Energy Master Plan by June 2019. Largest single state offshore wind capacity solicitation at 1,100 MW. Key New Energy Legislation increase the state’s Renewable Portfolio Standard to 35 by 2025 and 50 by 2050 with specific solar targets; establish a community-solar program; target 2 gigawatts of energy storage by 2030; and, establishes a zero-emission credit program. The Executive Order 8 also requires: Develop an Offshore Wind Strategic Plan Implement OWEDA’s Offshore Wind Credit program Procure the necessary resources and expertise including an offshore wind economic consultant Initiate discussion with sister states in the Northeast and Mid-Atlantic Region to explore the potential benefits of regional collaboration on offshore wind and other opportunities to combat climate change EO 28 requires the EMP to align with Executive Order 8’s directives, incorporate 600 MW of energy storage by 2021 and 2000 MW by 2030, and address energy efficiency and traditional transportation alternatives.
4
Offshore Wind Updates
5
Offshore Renewable Energy Credit Solicitation Timeline
Board Solicitation Technical Conference Application Deadline Evaluation Window Board Decision December 28, 2018 Jan. 28 – June 26, 2019 June 30, 2019
6
Federal East Coast Offshore Wind Leases
The Federal Department of Interior’s Bureau of Ocean Energy Management (BOEM) regulates renewable energy activities on the Outer Continental Shelf (OCS). To date BOEM has issued 3 commercial wind energy leases (Orsted, US Wind, and Equinor) offshore of New Jersey in the NY/NJ Bight.
7
The New York/New Jersey Bight
BOEM is also in the process of identifying additional lease areas in the NY/NJ Bight for the development of offshore wind energy facilities (shown in blue).
8
Federal Offshore Wind Commercial Leasing Process
Orsted : Approved SAP by BOEM US Wind: Must submit SAP to BOEM by Equinor : Submitted SAP to BOEM for review/approval. The NJDEP is actively meeting with these developers to identify their permitting requirements.
9
Federal Offshore Wind Commercial Leasing Process
Planning and Analysis BOEM publishes Call for Information and Nominations BOEM identified priority Wind Energy Areas (WEAs) offshore. WEAs are locations that appear most suitable for wind energy development, or Processes unsolicited application for lease BOEM may prepare an Environmental Assessment for Lease Issuance and Site Assessment Activities Leasing BOEM determines whether Competitive Interest exists If Competitive Interest exists, BOEM notifies the public and developers of its intent to lease through Sale Notices before holding a lease sale If Competitive Interest does not Exist, BOEM negotiates a lease (note: issuance may be combined with plan approval) Site Assessment Lessee conducts site characterization studies Lessee submits Site Assessment Plan (SAP) BOEM conducts environmental and technical reviews of SAP, eventually decide to approve, approve with modification, or disapprove the SAP If approved, Lessee assesses site (usually with meteorological tower(s) and/or buoy(s) Construction and Operations Lessee may conduct additional site characterization Lessee submits Construction and Operations Plan (COP) BOEM conducts environmental and technical reviews of COP, eventually deciding to approve, approve with modification, or disapprove the COP If approved, Lessee builds wind facility
10
Supporting the Offshore Wind Industry
New Jersey is centrally located to take advantage of the supply chain opportunities associated with the construction and operation & maintenance of the 8,000 MWs of Offshore Wind planned for the region.
11
Offshore Wind Challenges
Consideration of various environmental, economic, transportation, communications and safety impacts n. There are many public and private sector entities that oversee and/or utilize the resources above and below the ocean’s water surface (e.g., shipping, commercial & recreational fishing, telecommunications, sand & gravel storage)
12
Nuclear Update
13
Oyster Creek Nuclear Plant Shutdown
The nation’s oldest operating commercial power in the US, Oyster Creek, permanently ceased operations on September 17, 2018. The 625-megawatt single unit boiling- water reactor shut down 10 years prior to its license expiration. All the spent nuclear fuel from the reactor has been moved to the spent fuel pool, significant reducing offsite radiological risks.
14
Exelon Decommissioning – Next Steps
No later than 2024 Spent fuel to dry cast Up to 60 years to release site for unrestricted use SAFSTOR Option Site Monitoring Environmental Sampling On-going DEP Role Further reduces offsite radiological risks
15
Oyster Creek Sale On August 31, 2018, New Jersey- based Holtec International purchased Oyster Creek, pending approval by the NRC. Once approved, Holtec International takes over all regulatory and financial decommissioning requirements for, including the oversight and emergency planning commitments laid out in the January Administrative Consent Order that exceed the NRC requirements.
16
Proposed Accelerated Decommissioning
No later than 2021 Spent fuel to dry cast Site restoration 2027 Partial site release Site Monitoring Site clean up Environmental Sampling On-going DEP Role
17
Exelon/Holtec Decommissioning Comparison
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.