Download presentation
Presentation is loading. Please wait.
Published byGinger Gilbert Modified over 6 years ago
1
Dec 2008 doc.: IEEE /0xxx Nov 2011 802.11aa –Robust Audio Video Transport Streaming Atlanta Closing Report Date: Authors: Graham Smith, DSP Group Graham Smith, DSP Group
2
Dec 2008 doc.: IEEE /0xxx Nov 2011 Work Completed Resolved all initial Sponsor Ballot comments (11/1382r3) 147 comments Discussed 11/1417r1, “Ping-Pang Handoff” Consensus that subject was not in PAR for 11aa Passed Motion to approve a 15-day Sponsor Group Recirculation Ballot of D 7.0 Held a joint meeting with 801.AVB Slide 2 Graham Smith, DSP Group Graham Smith, DSP Group Bruce Kraemer (Marvell)
3
Joint meeting with 802.1AVB Provided 11aa update
Nov 2011 Joint meeting with 802.1AVB Provided 11aa update New 802.1BA "Audio Video Bridging Systems" standard Bridging and Metrics (latency/QoS) are the main topics of BA. 802.1AVB have been very happy with the liaison with 11aa and are looking for a continuing similar relationship to assist with the AV streaming aspects on the wireless side once 11aa is completed. Graham Smith, DSP Group
4
Goal for January Meeting
Nov 2011 Goal for January Meeting Complete comment resolution of Sponsor Ballot recirculation comments Start new recirculation Graham Smith, DSP Group
5
Timeline 11aa First Recirculation -- Sep 10, 2010
Nov 2011 Timeline 11aa First Recirculation -- Sep 10, 2010 Form Sponsor pool –May 2011 MEC Done – Aug 2011 Start Sponsor Ballot – Sep 2011 First Sponsor Recirculation – Nov 2011 Sponsor Ballot done (final WG approval) – Mar 2012 Final or conditional 802 EC approval – Mar 2012 RevCom/SA approval -- June 2012 (need to line up with appropriate RevCom/SA meeting dates) Graham Smith, DSP Group
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.