Download presentation
Presentation is loading. Please wait.
Published byFilippa Bianco Modified over 6 years ago
1
Workshop Genova http://www.ge.infn.it/geant4/workshop2001/
2-6 July 2001
2
Procedures 3 documents on SW process released recently
Design Development and tag Testing To be put in practice! In addition to Geant4-wide guidelines Feedback on procedures is welcome Improve where needed, based on experience Aim: continuously improving software process
3
Defect analysis and prevention
Last minute commit to CVS No possibility of feedback Change design without prior agreement Modify behaviour of physics models without prior agreement Change code under somebody else’s responsibility without prior agreement Tests are not documented Production of validation plots is not documented System tests changed during the release testing phase
4
Problem investigation
A few problem reports currently open In PRS and through direct communication They should be a priority Before fancy design iterations, new developments etc. We have not fully assessed and validated the current LowE implementation yet Availability of resources for problem investigation is a concern Complete and documented testing suite would help Database of problems needed PRS not sufficient (need more than bug reports)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.