Presentation is loading. Please wait.

Presentation is loading. Please wait.

Changes to: SMAT.0015 Material Flow Rev.8 By: Carlos Roman

Similar presentations


Presentation on theme: "Changes to: SMAT.0015 Material Flow Rev.8 By: Carlos Roman"— Presentation transcript:

1 Changes to: SMAT.0015 Material Flow Rev.8 By: Carlos Roman
Sr. Engineering Specialist

2 Procedure Changes Adding the following instructions to sections to section Manufacturing Team Member, Lead machinist or designee using caliper and/or micrometer will segregate Ta pins and Ti pins by diameter size as per the following table: Manufacturing Team Member, Lead machinist or designee will use different containers identified with label SFRM.0449 and write diameter size after part number to identify container and fill out the rest of the information required. Once the material is requisitioned, issued and inducted to Factory Works, the Manufacturing Team Member or designee moves the segregated pin containers to the designated manufacturing area. Drill Bit Size (mm) Pin Size Range Dia. 0.73 Dia. ( ) Dia. 0.74 Dia. ( ) Dia. 0.75 Dia. ( )


Download ppt "Changes to: SMAT.0015 Material Flow Rev.8 By: Carlos Roman"

Similar presentations


Ads by Google