3 timer – kan afsluttes når vi er færdige…. Agenda:
Præsentation af Eltronic Besøg i huset Synergi mellem Grundfos Biobooster og Eltronic © 2012 Eltronic A/S - Confidential
2
Customers cases Nitrogen Generator System
Gazcon has a on-site Nitrogen Generator System that are used for flushing of tanks in the Marine industry. Eltronic has been partner in the project and has developed, designed and integrated the control system incl. panels, HMI and SCADA
3
Customers cases Test site for LNG Fuel
Man Diesel & Turbo in Copenhagen, Denmark, has established a test facility utilising LNG as fuel for large scale two stroke engines. Eltronic has assisted with the development of the gas supply system plant including risk analyses and user- and maintenance instructions manuals. The experts of Eltronic have been coordinators on the site and have supplied know-how concerning rules and regulations with regards to the explosive areas.” MAN Diesel & Turbo Research and Development Center DK – Copenhagen MAN Diesel & Turbo
4
Customers cases ORECO BLABO System
Automated, mobile and modular, ‘non-man entry’ oil tank cleaning and oil recovery system. “At Oreco we do not see Eltronic just as ‘one more supplier’ we regard them as an important strategic business partner where together focus on delivering high value products to our end-customers, thus strengthening our mutual business objective and nurture our particular business mission. In plain words, we see each other as an extension of each others business”. Søren Hubert Petersen Sales & Marketing Director Oreco A/S
5
Customers cases Bow Loading System
”Eltronic has designed, developed and tested a new generation of a critical control system for Pusnes Bow Loading System ™. Thanks to the expert competences of Eltronic in the area of PLC programming we have reached a structured control system that is simple to maintain. Eltronic’s experts also contributed with valuable teaching of our own employees.” Ann-Kari Heier Vice President, Offshore Loading Systems Aker Solutions
6
Customers cases LNG Gas Valve Train
This project was developed for Hyundai Heavy Industries. Eltronics part in the project was to develop the Gas valve system, which is placed between the Fuel Gas Supply System and the ME-GI engine. The aim of the Gas Valve Train is to handle the operational demands from the ME-GI control system in operation, shutdown and in case of an emergency shutdown. Design pressure: 400 bar Design temperature: -40 – +80 °C Fail safe operation ATEX approved zone Operation with natural gas and purging system for N2.
7
References Grundfos: Robotapplikation for samling af el-motor.
- Induktion - Første gang med robotløsning - Kompakt løsning - Opsamling af data - 1 stk løsning. Warlstedt i DE 2 systemer
8
Buisness Unit Manager, Oil & Gas Tel +45 2032 2046 at@eltronic.dk
”We help companies enhance their global competitiveness” Anders Therkelsen Buisness Unit Manager, Oil & Gas Tel © 2011 Eltronic A/S ▪ Kilde Allé 4 ▪ 8722 Hedensted ▪ Denmark ▪ Tel ▪ ▪