1
Health Update To be constructed 305 Pledged 267 Planning Stage 168
Under Construction 39 Completed 12 Prefab Facilities 113
2
Facility Wise Status Facility Planning Stage Pre-construction Stage
Completed Total DHQ 8 3 11 THQ 7 1 2 10 RHC 19 33 BHU 119 25 6 158 Offices 4 157 39 12 219
3
District Wise Status District Planning Stage Pre-construction Stage
Completed Total Mansehra 3 28 7 41 Battagram 9 12 21 Shangla 5 1 2 8 Kohistan Abbottabad 15 4 20 Muzaffarabad 51 6 70 Poonch 35 36 Bagh 14 23 11 157 39 219