Download presentation
Presentation is loading. Please wait.
1
Coalinga S2S: Solar-thermal EOR
Binyamin Koretz Director, Strategic Planning & IP 1
2
Coalinga Solar to Steam Project (S2S)
Owner: Chevron Location: Coalinga, CA Purpose: Thermal Enhanced Oil Recovery Capacity: 29 MWth Solar field: 3,822 heliostats, each 15 m2 BrightSource delivered fully operational project to Chevron in October 2011 1-year performance test exceeded contractual goals
3
Coalinga S2S
4
Coalinga vs. future EOR plant
Commercial Plant Required thermal power capacity: 29 MWth 400 MWth Required mass flow of steam: 12 kg/s kg/s Required temperature of steam: 265 °C 290 °C Required pressure of steam: 68 bar 80 bar Steam quality 99.5% or higher
5
Solar EOR – general scheme
6
Coalinga S2S 1-line diagram
7
Construction
8
What happens when engineers make videos
9
View from the south
10
Typical performance vs. modeling
11
And on more difficult days
12
Potential market Chart Source: CERA estimate of cumulative solar thermal penetration in thermal enhanced oil recovery market by 2020
13
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.