Download presentation
Presentation is loading. Please wait.
Published byMarc-Antoine Lussier Modified over 6 years ago
1
June 2015 Wireless Chairs Standing Committee Proposed Initial OM Approval Process Bob Heile, Wi-SUN Alliance
2
WCSC OM-Initial Approval Process
June 2015 WCSC OM-Initial Approval Process Background: The WCSC feels it should create an Operations Manual to publicly document its Processes and Procedures. Needed both for the sake of transparency but also to establish a clear chain of authorization. To that end, it needs a Sponsor approved process for how to approve the initial OM (which will contain a procedure for ongoing maintenance) Bob Heile, Wi-SUN Alliance
3
WCSC OM-Initial Approval Process
June 2015 WCSC OM-Initial Approval Process Proposed Method: Initial OM is drafted by the WCSC and presented to the 802 EC for comment and approval. Initial Approval would require an absolute 75% affirmative vote by the 802 EC (i.e., a DNV or Abstain = NO) Initial Approval vote could be either at a meeting of the EC or by ballot A procedure (TBD) for ongoing maintenance would be part of the initial OM. Bob Heile, Wi-SUN Alliance
4
WCSC OM-Initial Approval Process
June 2015 WCSC OM-Initial Approval Process Motion: Move that the EC approve the initial approval process for the WCSC OM contained on slide 3 of DCN: ec wcsg Moved: Heile Second: Stephens Bob Heile, Wi-SUN Alliance
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.