Construction Management & Engineering
2017 Streets Resurfacing Construction Management & Engineering
2
Project Purpose The purpose of this project is to resurface approximately 13 miles of roadways, resurface/repair existing asphalt paths and pave a new path along Old Kings Road and the FP&L easement.
3
PROJECT CONTRACTOR Halifax Paving, Inc. is the proposed contractor based on their low-bid submission Halifax Paving, Inc. has performed numerous projects within the City of Palm Coast including: 2016 Street Resurfacing Pine Lakes Pkwy (North) Path Belle Terre Pkwy North Widening
4
Street Resurfacing List
Number of Street Being Resurfaced – 38 Street Resurfacing Mileage – 13.35
5
Trail Resurfacing and Rehabilitation
FP&L Asphalt Path New 10’ Asphalt Path Along Existing FP&L path
6
Trail Resurfacing and Rehabilitation
Old Kings Road Trail New 8’ Asphalt Path Connects existing sidewalk to new FP&L path
7
Trail Resurfacing and Rehabilitation
St. Joe Walkway Resurfacing
8
Trail Resurfacing and Rehabilitation
Pine Lake Path Path Repair
9
BUDGET Current Budget Includes: $1,550,000.00 for Street Resurfacing
$125, for Path/Trails
10
COUNCIL ACTION Approve Work Order in the Amount of $1,675, for Street Resurfacing, construction of a new path and path resurfacing/repair
11
Questions? Palm Coast Pkwy includes Old Kings Rd and Cypress Point Pkwy