1 1/18/2019 Projet de synthèse en génie logiciel LOG 790 Claude Y. Laporte et Denis Roy

2 Références Obligatoire
Futrell, R. T., et al. ‘Quality Software Project Management’, Prentice Hall, 2002. Matériel supplémentaire Sur le site WEB de l’ETS 1/18/2019

3 Étape 1 Sujet: Project Charter Definition Lecture:
Appendix C - Creating the Business Plan Appendix D - Understanding Systems Engineering Chapter 32 – Legal Issues in Software (facultatif) Chapter 7 – Defining the Goal and Scope of the Software Project Livrable: Contractual Agreement 1/18/2019

4 Étape 2 Sujet: Project Management Plan, Life Cycle, Standards and Environment Lecture: Chapter 3 – Process Overview Chapter 4 – Selecting Software Development Life Cycles Chapter 5 – Managing Domain Processes (facultatif) Chapter 6 – Selecting a Project Team (facultatif) Chapter 13 – Choosing and Organizational Form (facultatif) Chapter 30 – Software Quality Assurance Chapter 31 – Software Configuration Management Chapter 22 – Analysis and Design Methods (facultatif) Chapter 24 – Use of Tools (facultatif) Livrable: Project Management Plan 1/18/2019

5 Étape 3 Sujet: Requirements Elicitation & Specifications Lecture:
Chapter 16 – Eliciting Requirements Chapter 17 – Developing the Software Requirements Specification Livrable: Requirements Specification – Traceability and Verification Management Document 1/18/2019

6 Étape 4 Sujet: Work Breakdown Structure Definition Lecture:
Chapter 8 – Creating the Work Breakdown Structure Chapter 9 – Identifying the tasks and Activities Livrable: Work Breakdown Structure – Deliverables and Activities 1/18/2019

7 Étape 5 Sujet: Software Estimation including Risks Lecture:
Chapter 10 – Software Size and Reuse Estimates (facultatif) Chapter 11 – Estimation Duration and Costs Chapter 18 – Determining project Risks Chapter 20 - Reliability (facultatif) Livrable: Software Estimates – Justifications and Identified Risks 1/18/2019

8 Étape 6 Sujet: Planning & Scheduling Lecture:
Chapter 12 – Assigning Resources (facultatif) Chapter 15 – Scheduling the Work Livrable: Project Schedule, Tasks and Effort with Allocated Resources 1/18/2019

9 Étape 7 Sujet: Tracking & Oversight Lecture: Livrable:
Chapter 21 – Software Metrics (facultatif) Chapter 25 – Project tracking and Control Chapter 29 – Reporting and Communicating Livrable: Progress Indicator Mechanism – BCWP BCWS ACWP ACWS CR SPI CPI Defects Reports – Changes and Problems 1/18/2019

10 Étape 8 Sujet: Technical Project Development (reviews and reports)
Lecture: Chapter 23 – Validation and Verification Livrable: Reviews and Progress Reports 1/18/2019

11 Étape 9 Sujet: Post Mortem Lecture: Livrable: Evaluation Report
Chapter 28 – Post-Performance Analysis Livrable: Evaluation Report 1/18/2019