1 Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC) “CLIC 6th Stabilization Meeting’ on 9 June 2009”

2 Long (2-m) Main Beam Quadrupole prototype a remind….
Aim of this quadrupole prototype: Provide quickly a prototype for the stabilization studies Test different poles and coils assembly solutions (towards stabilization performances) Provide a magnet for developing and testing magnetic measurement system (very small and long magnet bore!) “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

3 a remind…. 3 assembly options
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

4 Quadrupole Cross-Section: Final EM Optimization
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE (Courtesy of A.Vorozhtsov) a remind…. NOTE: a gap of 3 mm between iron poles and coils is left to test different solutions for coils support/dumping system

5 Quadrupole Prototype procurement Status:
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Quadrupole Prototype procurement Status: Copper conductor : Ordered (with Luvata- Finland) Iron: Ordered (AFNOR C10 R type) Tender Drawings: Completed this week Coils Call for Tender: Send out hopefully this week to 3 Companies Iron machining: Selecting potential bidders

6 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

7 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

8 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

9 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

10 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

11 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

12 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

13 Courtesy of R. Leuxe EN-MME
“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

14 “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

15 “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

16 “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE