Presentation is loading. Please wait.

Presentation is loading. Please wait.

IMT-Advanced Closing Report

Similar presentations


Presentation on theme: "IMT-Advanced Closing Report"— Presentation transcript:

1 IMT-Advanced Closing Report
September 2008 doc.: IEEE /1187r0 September 2008 IMT-Advanced Closing Report Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Darwin Engwer Nortel Networks 4655 Great America Pkwy, Santa Clara CA 95054 408 495 2588 Bruce Kraemer (Marvell); Darwin Engwer (Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

2 Key Meeting Documents IMT Opening Report 11-08-0940 r1
September 2008 Key Meeting Documents IMT Opening Report r1 IMT Review Process r4 IMT-Adv Regulatory Background r2 in IMT-Advanced r0 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)

3 IMT-ADV Schedule September 2008 Dubai Korea
Bruce Kraemer (Marvell); Darwin Engwer (Nortel)

4 One Page Summary Most of Circular letter components completed in Dubai
September 2008 One Page Summary Most of Circular letter components completed in Dubai IMT.TECH contents/numbers finalized IMT.EVAL contents/numbers finalized Circular letter structure finalized Work to perform final cleanup and formatting will continue in correspondence Circular letter contents to be completed in WP5D Seoul, Korea October 8-15 Technology Templates Also Workshop Tuesday October 7 WP5D Reports require approval by SG5 in November 10,11 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)

5 July 802.11 Conclusion Pursue the following topic:
September 2008 doc.: IEEE /1187r0 September 2008 July Conclusion Pursue the following topic: How quickly/best can we determine complementary fit with 16m and seriously consider an SRIT submission? Explore possibility of joint 11/16 teleconference discussion. Obtain/review 16m evaluation of IMT.TECH fit. Explore how to achieve handoff (for example use of .21 mechanisms)? Establish timing of decision/engineering input – deadline? Establish Teleconferences to discuss topic prior to September Include IMTA discussion topic in September schedule Bruce Kraemer (Marvell); Darwin Engwer (Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

6 IMT-A/802.11/802.21 – Target Topic Sep 08
September 2008 doc.: IEEE /1187r0 September 2008 IMT-A/802.11/ – Target Topic Sep 08 Background IMT-A SRIT including solution requires use of is not sufficiently interested in IMT-A to submit its technology as a RIT. Without RIT status would need to consider a less direct “partnership” relationship such as as a media independent handover mechanism for non technologies Allows to be compliant with solution Goals Is the mechanism currently usable for / handover in the context of IMT.TECH? If not, exactly what needs to be added to , or to ensure adequate functionality? Generate slides for WG16 to consider including in their IMT-A Workshop presentation. Bruce Kraemer (Marvell); Darwin Engwer (Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

7 Questions #1 16 has mobile base stations and clients
September 2008 Questions #1 16 has mobile base stations and clients 11 has mesh , 16 has relay stations that could be fixed or mobile Can 21 handle all of these terminal types? Can 21 provide handover and meet circular letter requirements? How can 11 determine that it would meet minimum requirements to be accepted as an RIT? Bruce Kraemer (Marvell); Darwin Engwer (Nortel)

8 Question List #2 3GPP has ANDSF which parallels (or uses) 21.
September 2008 Question List #2 3GPP has ANDSF which parallels (or uses) 21. If 11 could use ANDSF it would be a valuable option. 21 might be used to increase the number of RIT interfaces especially if tied into the 3GPP RIT if connected through ANDSF Is 21 specification mature enough to be used Security is not developed Insufficient liaisons/support from mobile SDOs e.g. 3GPP 21 has good relationship with FMCA which suggests good link into wireline services with wired and wireless endpoints Rather than 21, interface thru TGu might be more viable Better metrics?: Lower latency, shorter schedule time, security Is there anything missing from TGU? Does TGu have adequate liaisons and SDO acceptance? Is there any RIT that actually wants to partner with 11 in an SRIT? Bruce Kraemer (Marvell); Darwin Engwer (Nortel)

9 Goal for November Bring IMT-A to a WG11 vote in November
September 2008 doc.: IEEE /1187r0 September 2008 Goal for November Bring IMT-A to a WG11 vote in November Present viability evaluation of handover options TGu, ANDSF, 21 Are these options or any other of sufficient value to 11? Can any solution or project meet the IMT-A submission schedule requirements Can 11 convince any RIT candidate that it would be a valuable SRIT partner Or useful add-on? Bruce Kraemer (Marvell); Darwin Engwer (Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)


Download ppt "IMT-Advanced Closing Report"

Similar presentations


Ads by Google