Presentation is loading. Please wait.

Presentation is loading. Please wait.

Group Moving Average Template Instructions

Similar presentations


Presentation on theme: "Group Moving Average Template Instructions"— Presentation transcript:

1 Group Moving Average Template Instructions
x Group Moving Averages (GMA) Process Control Plans by Sidney J. Lewis For ASQ, Baltimore Section February 10, 2004 Reference: Ross, S. Sparks, “ A group of Moving Averages Control Plan for Signaling Varying Location Shifts”, Quality Engineering, Vol. 15, No. 4, 2003 pp GMA Plans – Lecture 2/10/04 for Baltimore Section, ASQ Group Moving Average Template Instructions Group Moving Average Template Link to Excel file

2 Introduction A control chart type Purposes of CC: shifts, trends, changes of variation Identifies extend of random variation: Control Limits

3 Fig 1A - Raw data, and GMA Explain M A Fig 1A - data statistics note the variation in n=50 samples Fig 2 - Control Limits vs sample size Extent of R.V. determined by size

4 Fig 3 - Detect Shifts vs Sample Size
Fig 4 - ARL vs Probability

5 Fig 5 - X, MR Charts: In control
Excel generated: Mean 65, Sigma 2

6

7 Fig 1C - Limits, Z-Scores Limits Z-scores Scaled Z-scores Significance test column

8 Fig. 6 Fig 6 - Detecting shifts with GMAs Each GMA starts with target plus data points Plot Probability of an alarm vs sample size shift of .75: may be detected first with small samples, but most likely with large (m=8) Shift = 1.75: m=3 should signal by 2nd point (n=6) P=50% equiv to ARL=2 Can’t use runs! need independent points Large shifts caught by small samples; Small shifts need large samples

9 Fig 7 – .75 shift at #21 First by m=18 (pt 15) Last by m=3 (pt 17) GMA plots Fig 7 - different limits for GMAs, Z-scores same limits for Scaled

10 Fig 8 - X, MR chart of .75 shift pt 17

11 Fig 9 - Plotted GMAs - .75 Shift
Cluttered

12 Fig 9A - Z-scores Shift Less cluttered

13  Fig 9B - Scaled Z-Scores - .75 Shift
Clean m=18 first signal Options: table form (Fig 7) or Plot (9B)

14 Fig 10 – In-Control GMAs, Scaled Z
All points w/i limits

15 Fig 11 – 1.75 S shift m=3 first

16 Fig 12 – X, MR charts pt #3 caught it

17 Fig 13 – 1.75 Shift, GMA and Scaled Z-Scores plots

18

19

20

21


Download ppt "Group Moving Average Template Instructions"

Similar presentations


Ads by Google