1
The alternatives
4
Transition Keynsham Energy Group
A Hydroelectric Power Scheme for Keynsham. Is it possible?
5
What is a hydroelectric power scheme?
Uses water and gravity Provides a large amount of electricity Renewable Sustainable
6
Types of hydroelectric power schemes
3 main types Storage system – Dam creates a reservoir Pumped storage schemes Run of River (ROR) schemes In Keynsham we are suited to an ROR scheme
7
Where can it go? 3 Possible sites: Albert Mill Memorial Park Keynsham Weir Keynsham Weir – best current option
8
What could it look like?
9
How much electricity? Annual mean flow rate greater 20 m3/s*
If we take 20 m3/s as the peak flow rate: One turbine = 518 homes (1.96 M kWh per year) Two turbines = 1,036 homes (3.92 M kWh per year) *Estimated figure only
10
Who gets the electricity?
National grid Energy supplier pay: - Fixed sum per kWh generated - Separate payment for exported to national grid Payback in approx. 10 years
11
Funding Cost: Potentially between £300k* and £500k* Funding:
Bath and West Community Energy (BWCE) Create a ‘Keynsham’ energy company - Community members become shareholders *Estimated figures only
12
Next Steps Engage Community Landowners Weir/river owners
Environmental Agency Feasibility study
13
Further info: www.keynshamt.wordpress.com
Thank you Further info: