Working Journal Chad Fernelius
2
Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington Greens subdivision Salt Lake avenues basement remodel High priced homes Korloff Jewelers at the Gateway Parker International new office
3
DAYT- Huish job Prepared and painted floor with epoxy coating Prepared and painted floor with epoxy coating
4
DAYT- Huish job Created, installed, and used small scale concrete forming for exterior and interior utility pads Created, installed, and used small scale concrete forming for exterior and interior utility pads
5
DAYT- Huish job Installed door closers Installed door closers
6
DAYT- South Weber home Installed Installed Trex decking
7
DAYT- miscellaneous Framed drops, fireplace hearths, and other change orders. Framed drops, fireplace hearths, and other change orders. Supervised a basement remodel Supervised a basement remodel Poured sidewalks and driveways Poured sidewalks and driveways Paint- touchups and the Parker job Paint- touchups and the Parker job Executed change orders, repairs, punch lists, and inspection lists. Executed change orders, repairs, punch lists, and inspection lists. Supervised laborers Supervised laborers Installed hardware Installed hardware
8
Scott Call Construction custom finish work Projects along the northern Wasatch Front Projects along the northern Wasatch Front Performed all aspects of finish work including doors, closets, stairways, and trim-work. Performed all aspects of finish work including doors, closets, stairways, and trim-work.
9
Finish work Paint-grade Paint-grade door and casing
10
Finish work Stain-grade Stain-grade double door double door
11
Finish work Doors Doors with glass
12
Finish work Custom door mantle Custom door mantle
13
Finish work Base board Base board
14
Finish work Crown Crown
15
Finish work Crown Crown
16
Finish work Waffle ceiling wrapped and finished with alder Waffle ceiling wrapped and finished with alder
17
Finish- column wraps
18
Finish work Wall finishes and column wraps (shadow boxes) Wall finishes and column wraps (shadow boxes)
19
Finish- recessed panels
20
Finish- bead board
21
Finish- bead board- window sills
22
Finish- flex mold- base
23
Finish- mantle
24
Finish- closets
25
Finish- cold storage In Inprogress
26
Finish- railing
29
Finish- fiberglass columns
30
Finish work- Summary All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. I have also learned laminate and hardwood flooring through Scott Call Construction I have also learned laminate and hardwood flooring through Scott Call Construction My original internship (fall 2006) was with DAYT My original internship (fall 2006) was with DAYT I have learned many finish skills from Scott Call Construction from 2007- present. I have learned many finish skills from Scott Call Construction from 2007- present. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating.
31
Prior Experience Showcase My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months. My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months.
32
Framing I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell.
33
Framed homes The following are homes completely framed by my brother and I without our employers direct supervision. The following are homes completely framed by my brother and I without our employers direct supervision.
34
West Layton framed July 2005
35
Clinton framed August 2005
36
West Layton framed September 2005