Presentation is loading. Please wait.

Presentation is loading. Please wait.

By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what.

Similar presentations


Presentation on theme: "By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what."— Presentation transcript:

1 by Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what we did …………

2 WOODSTOCK We took on a job on Wednesday 6 th December which for some reason I happened to had to manage but never actually went to see initially, to quote on ! By now you must know we are exhausted the pressure in sleepy holy is on; all of a sudden the suns out and the Capetonions comes to live ! Demand - Demand - Demand – beware the Transvalers are coming and the foreigners are in Cape Town – everybody is cleaning up and this was our worst horror for 2006 !

3 Beetles

4 Rats ???

5 Holes, Cracks & Craters

6 Serious damage ……wood cracked off – all needed filling

7 Buckled and warped and very uneven….

8 And long & in serious neeeed….

9 Fixed best possibly ……tongue and groove floors (which has been chipped and worn away) … Blue pointer rat holes..

10 WOW !!!!– first coat

11 BEFORE….. LOUNGE Complete house is in Oregon Pine floors with an inlay of plain pine repairs (see section between brackets) done previously when client did renovations - Oregon Pine is available for repairs if you need – just ask next time and we will do it properly !!??

12 Same room….

13 End result after sealer – see normal pine (and colour difference !)

14 Fill-ups – sanded down – this section is oregon pine in lounge

15 Second coat….

16 Kitchen after sanded down 4 times …

17 Sealed – 3 rd time – floor so porous it would need 4, where the norm is 3 !

18 Starting to seal

19 3 rd Sealer …..

20 4 th sealer (which normally should only get 3 coats but floors extremely porous)

21 This floor is a horror – uneven – cracked and warped – should actually have been replaced !

22 Fixed and filled to the best our ability !

23 End result – if you had seen this initially you would not believe the final outcome

24 Done !!

25 Done !!!


Download ppt "By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what."

Similar presentations


Ads by Google