BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING.

Similar presentations


Presentation on theme: "BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING."— Presentation transcript:

1 BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING

2 BIM: Beyond Clash Detection WHAT IS BIM? 3D Coordination Scheduling (4D) Estimating (5D) Material Tracking RFI/Submittal Tracking Facilities Management Quality Control xD Turnover/ Closeout

3 BIM: Beyond Clash Detection THE BIG PICTURE OLD ISSUE TRACKING Meetings & Conversation s Phone Calls Email Field Notes NEW ISSUE TRACKING Independent Lists BIM When we will build it? How much is there to build? Are we ready to build it? What could prevent us from building it?

4 BIM: Beyond Clash Detection NEED FOR CHANGE Design - ProjectFabricate - ProjectBuild - Project Design - SteelFab - SteelBuild - Steel Design - InteriorsFab - InteriorsBuild - Interiors Design – Steel 1 Fab – Steel 1 Build – Steel 1 Design – Steel 1 Fab – Steel 1 Build – Steel 1 Design – Steel 1 Fab – Steel 1 Build – Steel 1 Basic Sequence Advanced Sequence Ideal Sequence GREATER COMPLEXITY REQUIRES TIGHTER CONTROL AND BETTER ISSUE MANAGEMENT

5 BIM: Beyond Clash Detection DESIGN ISSUES Communicate requests for information through the model Provide transparency & consensus Avoid issue stagnation Communicate requests for information through the model Provide transparency & consensus Avoid issue stagnation

6 BIM: Beyond Clash Detection SUBMITTAL PROGRESS Input submittal status into model during review Clearly identify pieces to be resubmitted Avoid fabrication delays Input submittal status into model during review Clearly identify pieces to be resubmitted Avoid fabrication delays

7 BIM: Beyond Clash Detection FABRICATION STATUS Communicate how its coming along Courtesy of Schuff Steel Started Fab Inspected

8 BIM: Beyond Clash Detection OVERALL PLANNING Sequence 1 Sequence 2 Sequence 3 Show the overall plan Helpful, but theres more… Show the overall plan Helpful, but theres more…

9 BIM: Beyond Clash Detection DETAIL PLANNING THIS WEEK NEXT WEEK TWO WEEKS OUT Communicates the exact items in each schedule task Utilized at weekly onsite meetings Ensures all items needed for the successor are completed Helpful, but theres still more… Communicates the exact items in each schedule task Utilized at weekly onsite meetings Ensures all items needed for the successor are completed Helpful, but theres still more…

10 BIM: Beyond Clash Detection DETAIL PLANNING Analyze quantities Validate resources needed Instill greater accuracy into schedules Analyze quantities Validate resources needed Instill greater accuracy into schedules

11 BIM: Beyond Clash Detection CHANGES 1. Steel Added 2. Quantified 3. Other Pieces Placed on Hold Courtesy Schuff Steel Extract change quantities from model Agree on pieces to be placed on hold until change is fully designed Extract change quantities from model Agree on pieces to be placed on hold until change is fully designed

12 BIM: Beyond Clash Detection MATERIAL TRACKING 1. Material Rec. 2. Logged 3. Model Updated 4. I NEED THIS PIECE, NOW! Understand whats onsite and whats not

13 BIM: Beyond Clash Detection LESSONS LEARNED Project specific problems dictate BIM use and value. 3D Coordination Scheduling (4D) Estimating (5D) Material Tracking Turnover/ Closeout RFI/Submittal Tracking Facilities Management Quality Control xD 3D Coordination Quality Control Material Tracking Scheduling (4D) 3D Coordination Facilities Management RFI/Submittal Tracking Turnover/ Closeout PROJECT B: PROJECT A:

14 BIM: Beyond Clash Detection LESSONS LEARNED Partners using BIM efficiently are absolutely necessary. Integrate BIM with Other Processes Utilize BIM for Drawing Creation Integrate BIM with Other Processes Utilize BIM for Drawing Creation Shop Fabrication Submittal Review Thanks to Schuff Steel, Goody Clancy Architects, Weldon Steel, Walter P. Moore Engineers, & Shockey Precast for the models in this presentation.