Presentation is loading. Please wait.

Presentation is loading. Please wait.

Korea Facilities Committee Liaison Repot

Similar presentations


Presentation on theme: "Korea Facilities Committee Liaison Repot"— Presentation transcript:

1 Korea Facilities Committee Liaison Repot
April, 2011

2 Outline Leadership Organization Chart Meeting Information
Upcoming Ballots Subcommittee/TF/WG reports Others

3 Leadership Committee Co-chairs Kwang Sun Kim (KUT)
Insoo Cho (Shinsung ENG)

4 Organization Chart <Facilities> Committee C: Kwang Sun Kim (KUT) C: Insoo Cho (Shinsung ENG) <Equipment Cleanness> TF L: Insoo Cho (Shinsung ENG) Korea Facilities Committee got ISC approval at July 15 for its formation.

5 Meeting Information Last meeting Next meeting
Friday, March 25, KR Spring Meeting Korea Standards Association in Seoul, Korea Next meeting Thursday, July 21, 2011, KR Summer Meeting SEMI Korea in Seoul, Korea for the latest update

6 Ballot Results Summary
Ballot Failed Technical Committee Review Doc.4771 (New Standard: Test Method for Equipment Fan Filter Unit, EFFU) Doc.4922(New Standard: Specification for Equipment FaN Filter Unit, EFFU)

7 Upcoming Ballots Technical ballots in cycle 4 or 5
Doc.4771A (New Standard: Test Method for Equipment Fan Filter Unit, EFFU) Doc.4922A (New Standard: Specification for Equipment FaN Filter Unit, EFFU)

8 Equipment Cleanness TF
Leader: Insoo Cho (Shinsung ENG) Current activities: Doc.4771 (New Standard: Test Method for Equipment Fan Filter Unit, EFFU) failed committee review and will reflect the reject comments to the 4771A. Doc.4922(New Standard: Specification for Equipment Fan Filter Unit, EFFU) failed committee review. While the TF review some negatives, there were a suggestion to change the document character from “Specification” to “Guideline”. The writer will consider this comment and will revise SNARF if needed.

9 SEMICON Korea 2011 Meetings (Jan.26 – 28)
Meeting Highlights: Korea I&C Committee kicked- off GEM300 TF formation approved. HB-LED standards promotion Had an opportunity to introduce SEMI Standards program to local HB-LED companies. Need to get more industrial opinion. Other KSAC decided to form 450mm information sharing group in 1H, 2011 3 Standards programs were held and had over 130 attendees in total. (GEM300/SECS STEP, F47 Seminar, and 3D Display workshop)

10 FPD Metrology Committee, EHS, I&C, Facilities, PV
Regional Staff Contact Information Name Natalie Shim Phone Office Address #4005 Trade Tower, Samsung-dong, Kangman-ku, Seoul, Korea zip: Committees In charge FPD Metrology Committee, EHS, I&C, Facilities, PV Equipment Cleanness TF Report


Download ppt "Korea Facilities Committee Liaison Repot"

Similar presentations


Ads by Google