Project Location: Pickens Debris Basin is located in La Crescenta, east of the intersection of Briggs Avenue and Cross Street. Project Scope: Remove existing timber planking on top of spillway Raise spillway by 5 feet Extend outlet tower by 5.5 feet Raise channel wall by 2 feet Regrade access road Capacity: Before (fall of 2009) 125,000 cubic yards After enlargement156,000 cubic yards Construction Dates: Start 07/31/2010 End10/11/2010
4
Project Location: Pinelawn Debris Basin is located in La Crescenta, northwest of the intersection of Pinelawn Drive and Pinecone Road. Project Scope: Remove existing timber planking and top of debris barrier posts Construct a concrete parapet wall at inlet structure Raise outlet tower by 5 feet Capacity: Before (fall of 2009) 3,200 cubic yards After enlargement 4,800 cubic yards Construction Dates: Start 09/30/2010 End 10/15/2010
7
Project Location: Starfall Debris Basin is located in La Crescenta, northeast of Pinecone Avenue and Starfall Drive. Project Scope: Remove existing debris barrier posts and timber planking at spillway Raise spillway by 7 feet Raise spillway wall by 4 feet Construct an access ramp Construct a front wall and access ramp wall Reconstruct access road Raise outlet tower by 3 feet Capacity: Before (fall of 2009) 15,000 cubic yards After enlargements 28,300 cubic yards Construction Dates: Start 07/29/2010 End 10/15/2010
9
Project Location: The project location is on Crescenta Valley Water Districts access road, 300 feet north of 6065 Canyonside Road in La Crescenta. Project Scope: Construct 72 inch diameter Corrugated Metal Pipe across the access road Install steel debris barrier posts Place concreted stone riprap Purpose: Redirect as much debris flow as possible away from Canyonside Road back to the adjacent Pickens Canyon watercourse Project Status: Environmental permit application to regulatory agencies 8/19/2010 Construction to follow in fall 2010