Presentation is loading. Please wait.

Presentation is loading. Please wait.

Additional Upstream Coil Shielding

Similar presentations


Presentation on theme: "Additional Upstream Coil Shielding"— Presentation transcript:

1 Additional Upstream Coil Shielding
SHMS Bender Magnet Additional Upstream Coil Shielding 2/4/2019

2 Target Chamber Spray Angles
SHMS Bender Magnet Target Chamber Spray Angles 2/4/2019

3 Spray Angle Through Chamber Window
Target Center 24.5 Inches (62.2 cm) Beam 4.33 Inches (11 cm) 15 Inches (38.1 cm) Tungsten 39° .8 Inches (2 cm) 1916 lb Spray Angle Through Chamber Window 2/4/2019

4 Beam Spray Angle From Target Target 8.66 Inches (22 cm) Shield Block
Illustrating SHMS at Angle of 40° 2/4/2019

5 Coil Shielding Support
SHMS Bender Magnet Coil Shielding Support and Main Shield Block 2/4/2019

6 Bender Magnet Coil Shielding – Main Block
with GEM Slide Assembly Installed 2/4/2019

7 Bender Magnet Coil Shielding Support
$1,360 Mounting Cradle Assembly (Aluminum) Cutout For HMS Snout Support Weldment (Aluminum) $2,330 Steel Adjuster Base Plate Bender Magnet Coil Shielding Support 2/4/2019

8 Beam Bender Magnet Coil Shielding – Main Block 25.5 Inches 12 Inches
Target Center 25.5 Inches (64.8 cm) 12 Inches (30.5 cm) Beam 25.3 Inches (64.3 cm) Lead 1270 lb Bender Magnet Coil Shielding – Main Block with GEM Slide Assembly Installed 2/4/2019

9 Bender Magnet Coil Shielding – Main Block
Main Shield Block will be fabricated in 4 inch thick pieces to reduce cost Revision 12 Inches (30.5 cm) Main Shield Block (Lead) 1270 lbs 3100 in3 3.94 Inches (10 cm) .70 Inches (1.8 cm) Bender Magnet Coil Shielding – Main Block Illustrating clearances between Main Shield Block and existing hardware 2/4/2019

10 Beam Bender Magnet Coil Shielding 12 Inches (30.5 cm) Lead Shield
HMS Snout shown HMS at minimum achievable angle while SHMS is at min angle of 5.5° Beam Bender Magnet Coil Shielding Illustrating SHMS at Min Angle of 5.5° 2/4/2019

11 Main and Additional Blocks
SHMS Bender Magnet Coil Shielding Main and Additional Blocks 2/4/2019

12 Beam Bender Magnet Coil Shielding – Main and Additional Shield Blocks
Target Center 25.5 Inches (64.8 cm) 15.75 Inches (40 cm) Beam 25.3 Inches (64.3 cm) Bender Magnet Coil Shielding – Main and Additional Shield Blocks with GEM Slide Assembly Removed 2/4/2019

13 GEM Active Slide Assembly Removed
15.75 Inches (40 cm) Main Shield Block will be fabricated in 4 inch thick pieces to reduce cost Revision Main Shield Block Additional Shield Blocks 12.0 Inches (30.5 cm) 3.75 Inches (9.5 cm) Additional Shield Blocks (Lead) 535 lbs 1305 in3 Total .70 Inches (1.8 cm) 1.7 Inches (4.3 cm) Bender Magnet Coil Shielding Blocks Main and Additional Shield Blocks Illustrating clearances between Main and Additional Shield Blocks and existing hardware GEM Active Slide Assembly Removed 2/4/2019

14 Shielding Block Installation
SHMS Bender Magnet Coil Shielding Shielding Block Installation 2/4/2019

15 Main Shield Block Installation
2/4/2019

16 Additional Shield Block Installation
Main Shield Block Additional Shield Block Installation 2/4/2019

17 Main Shield Block rests in Support Cradle and is locked in position with fasteners and Upper Tie Plate Additional Shield Blocks rest on Support Cradle and are pinned between Blocks and secured with an Upper Tie Plate 2/4/2019

18 Full Assembly Configuration Using Main, Additional
Shielding Blocks and Neutron Shield with GEM Sieve Slide Assembly Modified Brackets, Lead Shield Removed, Neutron Shield repositioned and attached to the Lead Shielding Assembly (Existing) 2/4/2019

19 Full HB Lead Shielding / Neutron Shield Option
15.75 Inches (40 cm) 1.44 Inches (3.7 cm) Existing Neutron Shield (New Position) Attached to downstream side of Lead Shielding Assy. Shield aperture is centered vertically and horizontally with aperture in Bender Window and Lead Shield .70 Inches (1.8 cm) Modify Mounting Bracket Full HB Lead Shielding / Neutron Shield Option Configuration illustrating use of Main Shield Block, Additional Shield Blocks and Neutron Shield Neutron Shield must be removed for SHMS to achieve minimum angle of 5.5° 2/4/2019

20 Full HB Lead Shielding / Neutron Shield Configuration
$8,000 Full HB Lead Shielding / Neutron Shield Configuration Configuration illustrating use of Main Shield Block, Additional Shield Blocks and Neutron Shield Neutron Shield must be removed for SHMS to achieve minimum angle of 5.5° 2/4/2019

21 Shielded Beam Pipe Concepts
SHMS Bender Magnet Coil Shielding Shielded Beam Pipe Concepts 2/4/2019

22 Tungsten Wedge Beam Pipe Concept
2/4/2019

23 Pavel’s Original Concept
Tungsten Wedge Beam Pipe Concept Pavel’s Original Concept 2/4/2019

24 Tungsten Wedge Beam Pipe
Tungsten Wedge Beam Pipe Concept 2/4/2019

25 Tungsten Wedge Beam Pipe Concept
SS Welded Bellows CF Flange / Metal O-ring Existing Beam Pipe (Modified) Shortened with new Mounting Flange and Metal O-ring Tungsten Wedge Beam Pipe Tungsten BP Support Tungsten Wedge Beam Pipe Concept 2/4/2019

26 Tungsten Wedge Beam Pipe Concept
SS Welded Bellows CF Flange / Metal O-ring Existing Beam Pipe (Modified) Tungsten BP Support Tungsten Wedge Beam Pipe Concept 2/4/2019

27 Tungsten Wedge Beam Pipe Concept
Close clearance between Support and HMS Snout Tungsten BP Support Design in a Vertical Adjustment Tungsten Wedge Beam Pipe Concept 2/4/2019

28 Tungsten Wedge 135 lbs 11.25 4.70 5.25 2 x 2 x ¼ Aluminum 2/4/2019


Download ppt "Additional Upstream Coil Shielding"

Similar presentations


Ads by Google