Download presentation
Presentation is loading. Please wait.
1
Marriott Marquis Queen’s Park
November 2001 doc.: IEEE /468r0 November 2018 117th Session of meetings of the IEEE Working Group for Wireless Specialty Networks Opening Report November 11-16, 2018 Marriott Marquis Queen’s Park Bangkok, Thailand Robert F. Heile, Wi-SUN Alliance Robert F. Heile
2
802.15 Organization Chart November 2018 To add your name
802.15WG Chair Bob Heile, Wi-SUN Alliance Vice Chairs Rick Alfvin, Linespeed Pat Kinney, Kinney Consulting Organization Chart Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to STUDY GROUPS: INTEREST GROUPS IG TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig IG Dependability (of Radio Links) Chair: Ryuji Kohno, IG High Rate Rail Communications Chair: Junhyeong Kim, ETRI IG Vehicular Assistive Technology ChairYeong Min Jang, Kookmin Uni IG 15.4 Guide Chair: TBD STANDING COMMITTEES SC IETF Chair: Pat Kinney, Kinney Consulting SC WNG Chair:: Pat Kinney, Kinney Consulting SC Maintenance / Rules On Hold: TG4r 15.4 ranging Working Group Technical Editor James Gilb Task Groups TG4md 15.4 Revision Chair: Gary Stuebing, Cisco TG7m Optical Wireless Communications Yeong Min Jang, Kookmin University Chair TG4w 15.4 Low Power Wide Area (LPWA) Chari: Robert, Jörg Friedrich-Alexander-Universität TG10a Routing Mode Addressing (RMA) Chair: Charlie Perkins, Futurwei TG4x Fan Enhancements (FANE) Chair: Matt Gilmore, Itron TG12 Consolidated ULI Chair: Pat Kinney, Kinney Consulting TG4y Security Next Gen (SECN) Chair: Don Sturek, Itron TG13 Gigbit OWC Chair: Volker Jungnickel Fraunhofer Heinrich Hertz Institute TG4z 15.4 Enhanced Impulse Radio (EIR) Chair: Tim Harrington, Pro-ID Robert F. Heile, Wi-SUN Alliance
3
Bangkok Session Objectives November 11-16, 2018
TASK GROUP 4w –LPWA Enhancements to LECIM PHYs Discussing proposals and drafting Updating work activity and time line TASK GROUP 4x –FAN Enhancements to the SUN PHYs Prepare for completion of first Sponsor Ballot TASK GROUP 4y –Security Next Generation (SECN) Discussing proposals TASK GROUP 4z –Enhanced Impulse Radio (EIR) Discussing proposals and coex issues in 6GHz band Robert F. Heile, Wi-SUN Alliance
4
Bangkok Session Objectives November 11-16, 2018
TASK GROUP 15.4md –Revision 4 Comment resolution from 1st Letter Ballot Continue seeking input on corrections, changes, and areas for possible deprecation Task Group 7m Revision 1 OWC Respond to RevCom comments if any Generate/Update Project Timeline TASK GROUP-10a Routing Mode Addressing (RMA) Prepare for completion of primary Sponsor Ballot Update Project Plan/Timeline Robert F. Heile, Wi-SUN Alliance
5
Bangkok Session Objectives November 11-16, 2018
TASK GROUP Upper Layer Interface (ULI) continue work on architecture/content Update Project Plan/Timeline TASK GROUP 13 –Multi Gigabit/sec OWC Continue work on ballotable draft Robert F. Heile, Wi-SUN Alliance
6
Bangkok Session Objectives November 11-16, 2018
Dependability (DEP) Interest Group: Discuss Contributions Evaluate if Study Group is warranted Vehicular Assistive Technology (VAT) IG: Discuss opportunities for OWC standards work for V2V and V2B communications THz Interest Group: Review current state of technology Consider making this a Technical Advisory Group (TAG) Robert F. Heile, Wi-SUN Alliance
7
Bangkok Session Objectives November 11-16, 2018
IETF Standing Committee IETF103 Review results from Bangkok Hear contributions Next steps NEW PROJECTS STANDING COMMITTEE (WNG) Review/discuss contributions MAINTENANCE STANDING COMMITTEE Review/discuss contributions (if any) RULES STANDING COMMITTEE Review/discuss changes regarding creating a TAG group category in the OM. Robert F. Heile, Wi-SUN Alliance
8
November 2018 Robert F. Heile, Wi-SUN Alliance
9
TG 802.15.4w LPWA November 2018 Closing Report
Joerg Robert FAU Erlangen-Nuernberg Joerg ROBERT, FAU Erlangen-Nuernberg
10
Main Agenda Items for the Week
November 2018 Main Agenda Items for the Week Approval of Waikoloa & Telco Minutes Update on SCHC Coexistence Assurance Document Drafting Future Schedule Joerg ROBERT, FAU Erlangen-Nuernberg
11
Meeting Achievements 4 meeting slots + presentation in 802.19
November 2018 Meeting Achievements 4 meeting slots + presentation in Update on Static Context Header Compression by Pascal Achieved agreement on Coexistence Document structure and initial presentation of doc. in Drafting Identification of missing elements Discussion of the feasibility and suitability of proposed technologies New draft will be on the private members area shortly after the meeting Joerg ROBERT, FAU Erlangen-Nuernberg
12
Next Steps Continue the drafting process
November 2018 Next Steps Continue the drafting process Finalize coexistence assurance document Work in telephone conferences Send initial draft version to James and Ben for first review before the January meeting Joerg ROBERT, FAU Erlangen-Nuernberg
13
Telephone Conferences
November 2018 Telephone Conferences Two telephone conferences Focus: Further drafting of the amendment Finalization of coexistence assurance document Dates: Doodle to find suitable dates Will be circulated via the TG4w reflector Joerg ROBERT, FAU Erlangen-Nuernberg
14
TG4w Draft Schedule TASK Completed Start of TG work Mar, 2018
November 2018 TG4w Draft Schedule TASK Completed Start of TG work Mar, 2018 Call for Proposals Technical Guidelines Doc. Initial discussion of proposals July, 2018 Editing Draft / Coexistence Document Nov, 2018 Jan, 2019 TG4w document review Feb. 2018 LB Jan, Mar, 2019 LB Comment Resolution May, 2019 SB July, 2019 SB Comment Resolution Sep, 2019 Submission to RevCom Mar, 2020 Joerg ROBERT, FAU Erlangen-Nuernberg
15
November 2018 Meeting Minutes Meeting minutes are available in document 15-18/601r0 (special thanks to Henk and Charlie) Joerg ROBERT, FAU Erlangen-Nuernberg
16
Thank You for Your Interest!
November 2018 Thank You for Your Interest! Joerg ROBERT, FAU Erlangen-Nuernberg
17
TG-FANE Closing Report
2/4/2019 TG-FANE Closing Report November 15, 2018 Matt Gillmore TG-FANE Chair Matt Gillmore - Itron
18
Jul 12, 2010 07/12/10 2/4/2019 TG BRC Motion Move that Task Group Tg4x requests WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of P x-D1 with the following membership: Matt Gillmore, Kunal Shah, Chris Calvert, Ruben Salazar, Phil Beecher, Gary Stuebing. The x BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Kunal Shah Seconded By: Ruben Salazar Unanimous Consent Matt Gillmore -Itron Page 18
19
Jul 12, 2010 07/12/10 2/4/2019 WG BRC Motion Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of P x-D1 with the following membership: Matt Gillmore, Kunal Shah, Chris Calvert, Ruben Salazar, Phil Beecher, Gary Stuebing. The x BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Matt Gillmore Seconded By: Matt Gillmore -Itron Page 19
20
IEEE 802.15.4y SECN Closing report
November 2018 IEEE y SECN Closing report November 15, 2018 Don Sturek IEEE y SECN Chair Don Sturek (Itron)
21
Work Plan IEEE 802.15.4md to address editorials in Section 9
Jul 12, 2010 07/12/10 November 2018 Work Plan IEEE md to address editorials in Section 9 See rogue comments in md-lb150-consolidated Add one new comment to next 4md letter ballot to include the cipher suite in the key descriptor IEEE md to address update of existing Annex B Add in examples of other v2 frames with Information Elements Don Sturek (Itron) Page 21
22
Work Plan Update key descriptor: Tero
Jul 12, 2010 07/12/10 November 2018 Work Plan Update key descriptor: Tero Create “Annex B” for AES-256-CCM: Don and Robert Create “Annex C” for AES-256-CCM: Need a volunteer Address ANA process for adding in cipher suites (use AES-256-CCM as first example): Don Don Sturek (Itron) Page 22
23
Progress in Bangkok Address editorials in 4md
Jul 12, 2010 07/12/10 November 2018 Progress in Bangkok Address editorials in 4md Plus add new Key Descriptor fields to cover existing AES-128-CCM* Address update to Annex B Add in examples of v2 MAC Command Frames, v2 frames with header and payload IE’s, v2 Multipurpose frames – Use Wireshark for these and omit interim calculations Agreed on work plan and assignments for all but “Annex C” material for AES-256-CCM Don Sturek (Itron) Page 23
24
To-Do before next IEEE 802.15 meeting
Jul 12, 2010 07/12/10 November 2018 To-Do before next IEEE meeting PAR/CSD for IEEE update See WNG presentation in San Diego Align with IEEE (ULI) Don Sturek (Itron) Page 24
25
IEEE 802.15.4z EiR Closing report
<November 2018> IEEE z EiR Closing report November Tim Harrington IEEE TG4z EiR Chair Tim Harrington (UWB Alliance)
26
Presentations 15-18-0543-00-004z-mac-considerations
Jul 12, 2010 07/12/10 <November 2018> Presentations z-mac-considerations z-mac-for-secure- ranging z-draft-text-for- inclusion-of-uwb-secure-service- information-element z-sequential-ranging- control-information-element Tim Harrington (UWB Alliance) Page 26
27
Additional Presentations
<November 2018> Additional Presentations z-inclusion-of- multicast-broadcast-ranging-in- information-element z-inclusion-of- ranging-fom-in-information-element z-draft-text-for- inclusion-of-uwb-secure-service- information-element Tim Harrington (UWB Alliance)
28
Additional Presentations
<November 2018> Additional Presentations dep-update-of-uwb- radio-regulation-in-japan z-frame-format-and- modes-revision-for-lrp-uwb-phy fcc ieee- 802-comment z-draft-text-covering- two-way-ranging-mechanisms- procedures-and-messages Tim Harrington (UWB Alliance)
29
Additional Presentations
<November 2018> Additional Presentations z-text-proposal-for- including-channel-3-for-enhancing-lrp- uwb z-hrp-uwb-phy- enhanced-mode-converged-consensus Tim Harrington (UWB Alliance)
30
Accomplishments Input to IEEE 802 Unified comments for 6 GHz NPRM
<November 2018> Accomplishments Input to IEEE 802 Unified comments for 6 GHz NPRM Completed merge of HRP PHY Merged LRP PHY Continued drafting MAC & PHYs Tim Harrington (UWB Alliance)
31
Jul 12, 2010 07/12/10 <November 2018> Timeline March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD July 2018 – Review new proposals – Merge Baselines for draft September 2018 – Drafting using merged baselines November 2018 – Drafting using merged baselines January 2019 – Complete drafting - 1st letter ballot March 2019 – Comment Resolution – Recirculation ballot May 2019 – Comment Resolution – Start Sponsor ballot July Comment Resolution – Forward to RevCom Tim Harrington (UWB Alliance) Page 31
32
January Interim Scheduled 8 sessions
Jul 12, 2010 07/12/10 <November 2018> January Interim Scheduled 8 sessions Continue drafting using merged baseline for LRP and HRP Letter ballot? Tim Harrington (UWB Alliance) Page 32
33
November, 2018 MD Opening and Closing Report Opening and Closing 2018 November Plenary Gary Stuebing Cisco
34
15.4md Sessions this Week Monday Tuesday Wednesday Thursday AM 1
November, 2018 15.4md Sessions this Week Monday Tuesday Wednesday Thursday AM 1 Apt 8/9th Floor Not Used AM 2 OP – 3rd Fl -Thai Boromphimarn 1+2 3rd Fl -Thai Boromphimarn 1+2 MP - 3rd Fl -Thai Boromphimarn 1+2 PM 1 PM 2 CP -3rd Fl -Thai Boromphimarn 1+2
35
Agenda Monday AM 1 Monday PM 2 Tuesday AM2 Tuesday PM 2
November, 2018 Monday AM 1 Review minutes and agree to Agenda Review Current Status of Comment Resolution Update Action Items Monday PM 2 Comment Resolution Tuesday AM2 Tuesday PM 2
36
Agenda Wednesday PM 2 Thursday PM 2 Comment Resolution Review Schedule
November, 2018 Wednesday PM 2 Comment Resolution Thursday PM 2 Review Schedule Set BRC and Meetings ?
37
Closing Report Approved Minutes and Agenda
November, 2018 Closing Report Approved Minutes and Agenda 6 Sessions Of Ballot Resolution Comment Resolution: Reviewed all comments – 51 Technical (of 126) comments to reviewed 40 Technical Rogue Comments (of 46) comments to be reviewed. 145 Editorial comments have been assigned to the editor
38
Closing Report Set a BRC and BRC Schedule Reviewed Timeline
November, 2018 Closing Report The 51 Technical comments have been assigned Set a BRC and BRC Schedule Reviewed Timeline
39
Seconded By: Phil Beecher
November, 2018 TG BRC Motion Move that TG4md requests WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P REVd-D01 with the following membership: Gary Stuebing(As Chair), Don Sturek, Kunal Shah, Ruben Salazar, Tero Kivinen, Phil Beecher and Shoichi Kitazawa. The md BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconference scheduled weekly starting November 29, 2018 on Thursdays at 3pm PT which will also be announced to the reflector as per the LMSC 802 WG P&P Moved By: Kunal Shah Seconded By: Phil Beecher No Objections
40
Moved By: Gary Stuebing Seconded By:
November, 2018 WG BRC Motion Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P REVd-D01 with the following membership: Gary Stuebing(As Chair), Don Sturek, Kunal Shah, Ruben Salazar, Tero Kivinen, Phil Beecher and Shoichi Kitazawa. The md BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Gary Stuebing Seconded By:
41
Proposed Timeline Nov 2018 Plenary (Bangkok) Jan 2019 (St. Louis)
November, 2018 Proposed Timeline Nov 2018 Plenary (Bangkok) Comment Resolution Jan 2019 (St. Louis) Comment resolution Recirc ballot Mar 2019 (Vancouver) Sponsor Ballot May 2019 (Atlanta) July 2019 (Vienna) Recirc
42
Proposed Timeline Sep 2019 (Asia) Nov 2019 (Kona) Comment Resolution
November, 2018 Proposed Timeline Sep 2019 (Asia) Comment Resolution Nov 2019 (Kona) Submit to Revcom – and party like its (because sounds cool)
43
Achievements by TG15.7m in Bangkok and Future Plan
Nov. 2018 Achievements by TG15.7m in Bangkok and Future Plan Submission Yeong Min Jang (Kookmin University)
44
doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> Nov Status at the End of Nov. Meeting IEEE P D3a has been submitted to RevCom and is on the December agenda to be considered for approval. Submission Yeong Min Jang (Kookmin University) <author>, <company>
45
doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> Nov. 2018 Task Group Motion #1 Motion for TG Approval to Form a TG7m BRC. TG7m requests that WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor balloting of the P m-D3a with the following membership: Yeong Min Jang, Rick Roberts, Jaesang Cha, Soo-Young Chang, Vinayagam Mariappan and Van Trang Nguyen. The TG7m BRC is authorized to approve comment resolutions and to approve the start of sponsor recirculation ballots of the revised draft on behalf of the WG. Moved by: Yeong Min Jang Seconded by: Vinayagam Passed Unanimously Submission Yeong Min Jang (Kookmin University) <author>, <company>
46
Plans for January Meeting
Nov. 2018 Plans for January Meeting RevCom comment resolution if any No session in January, 2019 Submission Yeong Min Jang (Kookmin University)
47
doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> Nov. 2018 WG motion #1: to Form a TG7m BRC Motion: Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor balloting of the P m-D3a with the following membership: Yeong Min Jang, Rick Roberts, Jaesang Cha, Soo-Young Chang, Vinayagam Mariappan and Van Trang Nguyen. The TG7m BRC is authorized to approve comment resolutions and to approve the start of sponsor recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved By: ??? Seconded By: ????? Submission Yeong Min Jang (Kookmin University) <author>, <company>
48
Updated Milestone and Schedule (1)
Nov. 2018 Updated Milestone and Schedule (1) 2017 Q1 January February March Continue comment resolution against D1 Prepare draft D2 Comment resolution to delete against unnecessary parts of D1 Finish comment resolution against D1 Q2 April May June Release Draft D2 D2 comment resolution Prepare D3 Release D3 Q3 July August September D3 comment resolution Release D4 D4 comment resolution Q4 October November December Release D5 D5 comment resolution Request (conditional) approval for Letter Ballot Release LB D0 Letter Ballot 1 for LB D0 Submission Yeong Min Jang (Kookmin University)
49
Updated Milestone and Schedule (2)
Nov. 2018 Updated Milestone and Schedule (2) 2018 Q1 January February March LB1 comment resolution Release LB D1 Request for Recirc Ballot 1 for D1 LB D1 comment resolution Q2 April May June LB D2 LB D2 comment resolution Q3 July August September Release SB D2a SB D2a comment resolution SB Recirculation Q4 October November December SB D3 comment resolution SA review or SB Recirculation RevCom Submission Yeong Min Jang (Kookmin University)
50
Updated Milestone and Schedule (1)
Nov. 2018 Updated Milestone and Schedule (1) 2019 Q1 January February March Publish the standard IEEE Q2 April May June Q3 July August September Q4 October November December Submission Yeong Min Jang (Kookmin University)
51
doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> February 19 <November 2018> TG10a (RMA) Officers Chair Charlie Perkins Vice Chair Joerg Robert Slide 51 <Charlie Perkins>, <Futurewei> Page 51
52
<November 2018> Goal of TG10a Define how the addressing and route information are to be used by the routing modes, including at least the following: E2E acknowledgement from mesh route in non-storing mode P2P routing using a combination of up/down routing in non-storing mode On-demand P2P routing for E2E acknowledgement in non-storing mode On-demand path storing when sending unicast in non-storing mode <Charlie Perkins>, <Futurewei>
53
TG10a Meeting Agenda/Goals
doc.: IEEE < e> <month year> February 19 <November 2018> TG10a Meeting Agenda/Goals Two meetings were held. Wednesday AM1 meeting resolved all Sponsor Ballot comments received so far, and voted to form a BRC. Thursday AM2 meeting was held for the purpose of approving BRC teleconference for P a_D03. Minutes are available: DCN a. Wednesday 14 November, AM1: Opening report, Agenda ( a), Review & Status / Sponsor Ballot Comment Resolution ( a), BRC formation Thursday 15 November, AM1: Cancelled Thursday 15 November, AM2: Timeline, AoB, Adjourn Slide 53 <Charlie Perkins>, <Futurewei> Page 53
54
WG Vote for BRC for P802-15-10a drafts
<November 2018> WG Vote for BRC for P a drafts Move to request that the WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Ballot of the P a_D02 with the following membership: Kiyoshi Fukui, Joerg Robert, Clint Powell, Tero Kivinen, and Charlie Perkins (as chair). The a BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved: Tero Seconded: Joerg Vote Results: No objections, so motion is approved <Charlie Perkins>, <Futurewei>
55
BRC formation for a Sponsor Ballot
<November 2018> BRC formation for a Sponsor Ballot Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of the P a_D02, or latest draft, with the following membership: Kiyoshi Fukui, Joerg Robert, Clint Powell, Tero Kivinen, and Charlie Perkins (as chair). The a BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P.. Moved: Charlie Seconded: Rick Vote Results: No objection <Charlie Perkins>, <Futurewei>
56
doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> February 19 <November 2018> Schedule TASK Start Completed TG10a Jan, 2018 May, 2019 Problem Statement Agree on solution approach May, 2018 Draft TG Comment Collection July, 2018 WG Letter Ballot Sept, 2018 WG Recirculation Ballot Sept 11, 2018 Sept 27, 2018 BRC Conference Call Oct 3, 2018 Slide 56 <Charles Perkins>, <Futurewei> Page 56
57
doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> February 19 <November 2018> Schedule, continued TASK Start Completed EC Approval for Sponsor Ballot Oct, 2018 Sponsor Ballot Nov, 2018 Resolve Sponsor Ballot Comments Sponsor Ballot Recirculation Dec, 2018 RevCom / IEEE SASB Approval Feb 8, 2019 March 21, 2019 IEEE-SA Publication May, 2019 July, 2019 Slide 57 <Charles Perkins>, <Futurewei> Page 57
58
BRC Conference Call Schedule
<November 2018> BRC Conference Call Schedule November 21, 7:30am Pacific Time <Charlie Perkins>, <Futurewei>
59
Meeting Accomplishments
doc.: IEEE < e> <month year> February 19 <November 2018> Meeting Accomplishments Resolved all comments received to date for Sponsor Ballot Ballot Resolution Committee (BRC) formation Timeline reviewed and modified Requested 2 meeting slots for January Interim BRC teleconference scheduled Slide 59 <Charles Perkins>, <Futurewei> Page 59
60
doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> February 19 Future Efforts <Nov 2018> January 2019 session Describe Module SAPs L2R Charlie Perkins KPM Tero Kivinen 6top Pat Kinney Finish delineation of all requirements for MPM Slide 64 <Pat Kinney>, <Kinney Consulting LLC> Page 64
61
Meeting Accomplishments
doc.: IEEE < e> <month year> February 19 <Nov 2018> Meeting Accomplishments Discussion on Profile clause in preliminary draft ( ) Created Profile MAC sub-types to allow MAC functions to be entered into Profile Types Working on entering all Pibs into Profile sub-types Yang modeling exercise ( ) Used portions of security protocol as a trial Modules Agreed that the standard shall define the module SAPs Management Protocol Module (MPM) Work on required MPM functions by reviewing “upper layer” references in IEEE Agreed that the standard is not required to dictate how the MPM implements the “upper layer” requirements Slide 65 <Pat Kinney>, <Kinney Consulting LLC> Page 65
62
May 2015 doc.: IEEE /0496r1 November 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication November 2018 Closing Report Date: Author: Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
63
May 2015 doc.: IEEE /0496r1 November 2018 Abstract This presentation contains the IEEE TG13 Multi- Gbit/s Optical Wireless Communication closing report for the November 2018 session in Bangkok. Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
64
TG13 schedule in Bangkok MON TUE WED THU AM1 AM2 PM1 PM2 PM3
May 2015 doc.: IEEE /0496r1 November 2018 TG13 schedule in Bangkok MON TUE WED THU AM1 TGbb#1 TG13 #1 TGbb#5 AM2 TG13 #2 TG13#5 PM1 TGbb#2 TG13#3 TG13#4 TG13#6 PM2 TGbb#3 TGbb#6 TG13#7 PM3 THz tutorial TGbb#4 WG closing Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
65
TG13 activities this week
May 2015 doc.: IEEE /0496r1 November 2018 TG13 activities this week 7 time slots this week starting Tuesday AM1 Further contributions to the MAC Beacon-enabled mode: doc /0562r0 doc /0410r1 Non-beacon-enabled mode: doc /0488r0 Comments resolution Include new text and resolved comments into the draft Create to-do list on missing items in the Spec Discuss finalization of the TG13 draft New ToC for D /0600r1 Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
66
To-do list in TG13 General MAC features Input missing on
IEEE 802 LAN Ethertype Yes - see minutes Aggregation Yes - see minutes Fragmentation Yes - via frame control field Security Yes – take it from y QoS Yes - simplified, just one ToS Input missing on HB-PHY header Volker Alignment on BE MAC mode Lennert, Xu Text for BE MAC mode Lennert, Xu features to be deleted all List of frame subtypes after all of the above is done Volker Jungnickel (Fraunhofer HHI)
67
Plan for finalization of TG13 Spec
December/January: Create missing text, review existing draft, identify what is obsolete January Interim: Review text inputs, integrate them into the draft, approval for WGLB February: Create draft 4.0, submit for WGLB March Plenary: Resolve comments from WGLB, start recirc May Resolve comments on recirc, start sponsor ballot Volker Jungnickel (Fraunhofer HHI)
68
May 2015 doc.: IEEE /0496r1 November 2018 TG13 Motion #27 Update sections and subsections in draft D3.2 according to the Table of Content agreed in doc /0600r1. Moved by Nikola Serafimovski Seconded by Tuncer Baykas Y/N/A = 4/0/0 Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
69
May 2015 doc.: IEEE /0496r1 November 2018 TG13 Motion #28 Approve the technical comments resolved in doc /r4 and update TG13 draft accordingly. The Technical Editor is granted the right to work in all accepted editorial comments. Moved by Nikola Seconded by Chong Y/N/A = 4/0/0 Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
70
Plans until January D3.2 word is ready by Nov. 23rd 2018
May 2015 doc.: IEEE /0496r1 November 2018 Plans until January D3.2 word is ready by Nov. 23rd 2018 Ask John to provide a pdf Comments are due Jan. 7 Text input for D4 is due Jan. 10 TG13 Telcos are scheduled on Nov :30-10:30 U.K. on editorial issues for D4 Nov :00-11:00 EDT review of first MAC text Dec :30-10:30 EDT on further MAC text Jan. 8 9:30-10:30 EDT preparing Interim mtg. Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
71
TG13 Plans for January Interim
May 2015 doc.: IEEE /0496r1 November 2018 TG13 Plans for January Interim 8 sessions requested Review text inputs Integrate them into the draft Comments resolution against D3.2 Start WGLB Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)
72
Suggested timeline for SPEC generation
July 2018 Suggested timeline for SPEC generation March 2018 (Rosemont) Resolution of first comments against D2 Discuss on PM PHY Brainstorm on MAC April 2018 Submit further comments against D2 Finalize evaluation of PM PHY, Submit LB OFDM PHY text May 2018 (Warsaw) Comment resolution against D2 Present LB PHY Discussion of MAC features, issue CfP June 2018 Prepare HB OFDM PHY text proposals Submission of comments against D2 and MAC proposals July 2018 Present and discuss HB OFDM PHY text Resolve all comments against D2 incl. MAC Discussion MAC text proposals August 2018 Create D3 Comment submission against D3 Comments against HB PHY September 2018 Comment resolution against D3 Work on TG13 MAC October 2018 Create D3.1 Provide technical inputs November 2018 Resolve comments Hear technical contributions to MAC December 2018 Release D4 Work on MAC text January 2019 Provide MAC text inputs Start WGLB (30 days) February Collect WGLB comments Qiang Li (John) (Huawei)
73
doc.: IEEE 802.15-<doc#>
November 2018 IEEE IG DEP Closing Report Bangkok, Thailand November 15th, Ryuji Kohno(YNU/CWC-Nippon) Shoichi Kitazawa (ATR)
74
doc.: IEEE 802.15-<doc#>
November 2018 Meeting Objectives IG-DEP activities including background and necessity of a new standard, CFI, responses for CFI, application matrix, focused use cases, additional use cases technical requirement, draft of PAR and CSD have been reviewed again. Corresponding to request of cooperation from ETSI smartBAN and smart M2M, commonality and uniqueness have been discussed. Primary use cases with large demand of this standard from car and car electronics manufactures such as internal car, intervehicle and factory manufacturing line networks have been focused but extension of medical BAN to car BAN has been discussed. Discussion with IEEE z was helpful to speed up IG-DEP. Better approach such as amendment of 15.6 MAC has been discussed. By updating technical requirement table for dependable BAN, focused use cases which have common requirement has been summarized. Before next March meeting, next action will be determined. Shoichi Kitazawa (ATR)
75
IG DEP schedule for the week
doc.: IEEE <doc#> November 2018 IG DEP schedule for the week Monday Tuesday Wednesday Thursday AM1 AM2 WNG Mid-Plenary PM1 IG-DEP Apartment 8 PM2 PM3 IEEE802.15 Closing Plenary Shoichi Kitazawa (ATR)
76
Meeting Accomplishments
07/12/10 November 2018 Meeting Accomplishments Review Discussion in Previous Meetings Call for Agenda in this week Review of IG-DEP activities 1. Overview of Review of IG Dependability Activities for Cars and other IoT & M2M Use cases and Amendment of IEEE Wireless Medical BAN dep Overview of ETSI Smart BAN Project Activities doc.# dep Reviewing IEICE TC on Reliable Communication and Control (RCC) Reviewing IEICE TC on Healthcare and Medical Information Communication Technology (MICT) doc.# ETSI SmartBAN –SmartM2M joint meeting doc.# dep Discussion 6. Review of IEEE Wireless Medical BAN doc.# odep 7. Focused and Additional Applications, and Updated Technical Requirements doc.# dep 8. Discussion on enable MAC and PHY technologies for enhanced dependability 9. Discussion on approach to net step either a new standard, amendment of 15.6 or others 10. Necessary Process and Possible Timeline to SG and next steps
77
doc.: IEEE 802.15-<doc#>
November 2018 Contributions dep-ig-dependability-july-2018-meeting-agenda dep-ig-dep-opening-information-for-november dep-ig-dependability-november-meeting-agenda dep-ig-dep-overview-of-IG-DEP-Overview of Review of IG Dependability Activities for Cars and other IoT & M2M Use cases and Amendment of IEEE Wireless Medical dep-ig-dep-Overview of ETSI Smart BAN Project Activities dep-ig-dep-Update of UWB Radio Regulation in Japan dep-ig-dep-IG DEP Focused and Additional Applications, and Updated Technical Requirements dep-ig-dep-Overview of Japanese IEICE TC on Reliable Communication and Control (RCC) dep-ig-dep-Japanese IEICE TC on Healthcare and Medical Information Communication Technology (MICT) dep-ig-dep-ETSI TC Smart BAN Update dep-ig-dep-november-2018-meeting-minutes dep-ig-dep-november-2018-closing-report Shoichi Kitazawa (ATR)
78
Thank You ! Any Questions ?
07/12/10 November 2018 Thank You ! Any Questions ?
79
VAT IG 11th Meeting, Bangkok
February 19 VAT IG 11th Meeting, Bangkok Closing Report Nov. 2018
80
February 19 Objective of Meeting Call for applications and publicizing VAT IG activities Call for presentation about VAT and some study items of VAT Hearing of presentations about VAT Direction for VAT SG Discussion of Draft PAR and Draft CSD for High Rate OCC SG
81
Accomplishment for the Nov. meeting
Nov meeting: 2 session (Tue PM2 and Wed. AM1) 2. Contribution presentations: + 6 contributions from Kookmin University + 8 contributions SNUST. 3. Discussions and completed - Publicizing VAT IG activities - Draft version of CSD and PAR document
82
Plans for Jan. Meeting Requesting 3 sessions
February 19 Plans for Jan. Meeting Requesting 3 sessions Generate and circulate a “VAT Call for Applications Presentation” paragraph Invite interested parties: Automotive companies, ADAS, Drone, Lighting sources and etc. Call for some study items of VAT
83
TAG THz November 2018 Closing Report
Thomas Kürner, TU Braunschweig
84
Meetings/Contributions
November 2018 Meetings/Contributions 2 meetings on Mon AM1 and on Wed PM2 15 participants Tutorial on Monday evening 4 contributions: Contribution #1 (Rehearsal for the tutorial in Monday evening) Thomas Kürner, Akifumi Kasamatsu, Onur Sahin, and Carlos Castro, “Tutorial: THz Communications - An Overview and Options for IEEE 802 Standardization” ( r2) Contribution #2 Thomas Kürner, Tetsuya Kawanishi “Introduction to the Horizon 2020 EU-Japan Project ThoR” ( r2) Contribution #3 Tetsuya Kawanishi “Impact of wind on link performance in fixed wireless services” ( ) Contribution #4 Thomas Kürner, “300 GHz Channel Measurements in a Real Data Center - First Results” ( ) Thomas Kürner, TU Braunschweig
85
Next meetings Next Meetings of the TAG THz
November 2018 Next meetings Next Meetings of the TAG THz March IEEE 802 Plenary, Vancouver, Canada July IEEE 802 Plenary, Vienna, Austria Thomas Kürner, TU Braunschweig
86
doc.: IEEE 802.15-<15-18-0496-00-0mag>
<Nov 2018> February 19 SC Meeting Goals <Nov 2018> SC Maintenance Wednesday 12 Nov, AM1 Discuss requested changes with Existing Standards Discuss requested changes with Operations Manual (OM) Addition of Tech Advisory Group (TAG) Addition of Process for changing OM ANA registration of alternate cryptographic algorithms SC WNG Wednesday 12 Nov, AM2 Dynamic MAC address assignment to end-stations by Antonio de la Oliva wng-proxy-nd-discovery-in by P Thubert by D Sturek SC IETF Monday 12 Nov, PM2 IETF-103 Accomplishments: 6tisch, core, 6lo, roll, suit, lp-wan Thursday 15 Nov, AM1 Static Context Header Compression (SCHC) applied to Slide 93 <Pat Kinney>, <Kinney Consulting LLC> Page 93 <Pat Kinney>, <Kinney Consulting LLC>
87
doc.: IEEE 802.15-<15-18-0496-00-0mag>
<Nov 2018> February 19 <Nov 2018> SC Accomplishments Maintenance Changes with Existing Standards: None requested Changes with Operations Manual: Discussed adding a new type of group, i.e. technical advisory group (TAG) to the Operations Manual (OM), other changes included updating the links to references and adding text on the process of modifying the OM. The group approved the amended OM and forwarded it to the WG for approval. SC WNG Three presentations were made on the subjects of: Dynamic MAC address assignment to end-stations wng-proxy-nd-discovery-in Profiles-for-IEEE SCwng requests that the WG approve forming a new IG Profile IETF Reviewed status results for IETF Constrained WGs at IETF 103: 6tisch, Core, 6lo, Roll, lp-wan First meeting of SCHC for Reviewed all overhead and reviewed IETF document “SCHC for lpwan applications draft-authors-lpwan-schc ” Slide 101 <Pat Kinney>, <Kinney Consulting LLC> Page 101 <Pat Kinney>, <Kinney Consulting LLC>
88
doc.: IEEE 802.15-<15-18-0496-00-0mag>
<Nov 2018> February 19 <Nov 2018> SC Motions SCmaintenance requests that the WG approve the revised Operations Manual described in Moved by Pat Kinney, SCmaintenance chair SCwng requests that the WG approve forming a new IG for Profiles, i.e. IG Profile Moved by Pat Kinney, SCwng chair Slide 102 <Pat Kinney>, <Kinney Consulting LLC> Page 102 <Pat Kinney>, <Kinney Consulting LLC>
89
Upcoming Sessions November 2018 January 13-18, 2019, Hilton St. Louis Missouri at the Ballpark, 802 Wireless Interim Session.* March 10-15, 2019, Hyatt Regency Vancouver and Fairmont Hotel Vancouver, Vancouver, Canada, 802 Plenary Session. May 12-17, 2019, Grand Hyatt Atlanta in Buckhead, Atlanta, Georgia, USA, 802 Wireless Interim Session.* July 14-19, 2019, Austria Congress Centre, Vienna, Austria, 802 Plenary Session. September 15-20, 2019, Marriott Hanoi (TBC), 802 Wireless Interim Session.* November 10-15, 2019, Hilton Waikoloa Village, Kona, HI, USA, 802 Plenary Session. Robert F. Heile, Wi-SUN Alliance
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.