Download presentation
Presentation is loading. Please wait.
2
TSAG Overview Mission Vision Core Values Operating Principles
3
Mission Statement TSAG is a not-for-profit provider of quality technical service and training for First Nations in Alberta
4
Supporting Strong Community
Vision Statement Supporting Strong Community
5
Core Values Accountability
We accept responsibility for our actions and decisions. Integrity We value honesty, trust, and confidentiality in our relationships. Quality We are committed to achieving excellence. Respect TSAG will respect the rights of First Nations, our partners, and our employees.
6
Operating Principles Fairness
TSAG will ensure that resources allocated to us are used for the benefit of all First Nations in Alberta. Transparency TSAG will practice transparent and open communication, sharing information and technical expertise freely with First Nations organizations in Alberta. Teamwork TSAG works cooperatively and collaboratively with Alberta First Nations and other partners to improve quality of life and build a safe, sustainable future. Safety TSAG proactively promotes and models safety for our clients, our employees, and our partners. Ethics TSAG will act ethically in all dealings with First Nations, our employees and partners
7
TSAG History On November 19th, 1996 TSAG received its mandate from the Chiefs of Alberta at the Chiefs Summit V. TSAG opened its doors in January 1998. TSAG was among the first organizations to focus on providing technical services and training for First Nations in Alberta in the Treaty 6, Treaty 7, and Treaty 8 areas. January 4th, 2000 Vaughn Paul joined TSAG as CEO.
8
TSAG Governance Structure
TSAG takes direction from the Chiefs of Alberta. We consult with the Chiefs Steering Committee and Board of Directors. There is representation from Treaty 6, 7 & 8 in Alberta
9
TSAG Programs Asset Management Circuit Rider Training Program
Environmental Management Fire Protection & Prevention Housing Information Technology Services On-Reserve Housing Program
10
On-Reserve Non-Profit Housing Program
TSAG has been selected as the successful proponent by CMHC to complete the Alberta On-Reserve Non-Profit Housing Program inspections.
11
On-Reserve Non-Profit Housing Program
We have secured contracts with a variety of subcontractors to complete inspections throughout the Alberta region. There are three types of services that will require inspection services: Section 95 Progress Advance Validations Physical Condition Reviews, and Renovation Programs reviews
12
Section 95 Advance Validations
Roles of the Subcontractor: Reviews are strictly for the purpose of confirming percentage of work completion Progress advancing and are not a guarantee of code compliance nor of quality construction A maximum of six (6) progress advance reviews will be completed Completed progress advances report forms (#60225) will need to be completed and sent to TSAG Inspection Coordinator for review and submission TSAG will maintain any drawings or other documentation received for each progress of project
13
Section 95 Advance Validations
Roles & Responsibilities of the First Nation: First Nation has control and responsibility for the construction and administration of the project To ensure the quality of work To arrange for progress reviews with FNH
14
Section 95 Advance Validations
Progress Advance Report:
15
Physical Conditions Review
Background of the Physical Condition Reviews: Homes constructed through government funding Effort to maintain the properties and uphold the overall social objectives of government programs Annual Financial Statement Reviews Client Visits Physical Condition Reviews
16
Physical Conditions Review
Importance of the Physical Condition Reviews: Monitor the physical condition of projects Assess and records overall condition of Section 95 projects in database Identify potential improvements to maintenance/capital replacement Assist with capital replacement planning
17
Physical Conditions Review
Objective of a Physical Condition Review: Identify the deficiency Assess the priority level of the deficiency Describe the cause (if not apparent) Briefly identify the most cost-effective means to correct Provide a cost estimate to correct; and Identify whether the work is considered maintenance or capital replacement
18
Physical Conditions Review
Physical Condition Review – What to Report: Report on Deficiencies Sample of units to review –usually 10-20% Immediate Health & Safety Items (Verbally & in report)
19
Physical Conditions Review
20
Physical Conditions Review
Physical Condition Review – Timelines: Deficiencies Categorized As: Urgent: To be addressed immediately (Health and Safety Item) Short Term (ST): To be addressed within 1 year; Medium Term (MT): To be addressed within 1 to 3 years; Long Term (LT): To be addressed within 3 to 5 or 5+ years
21
Physical Conditions Review
Physical Condition Review – Timelines: Assessment Categorized As: Excellent Unit is well maintained No deferred maintenance No repairs identified Above Average Well maintained Some repairs however not considered excessive Building components and systems working appropriately Average Repairs identified for majority of portfolio –not considered serious Some deferred maintenance No immediate threat to health and safety
22
Physical Conditions Review
Physical Condition Review – Timelines: Assessment Categorized As: Below Average Immediate repairs needed Deferred maintenance and capital needs identified Poor Significant evidence of deferred maintenance Capital repairs outstanding which impact building integrity Health and safety items identified Units require significant repairs for continued occupancy
23
Physical Conditions Review
Defining a Deficiency: In the context of portfolio management “satisfactory state of repair” means: Major building components (structural components including the building envelope, fire safety, heating, electrical, and plumbing systems) are performing and receiving regular maintenance as required by design and the authority having jurisdiction; and have not exceeded their useful lives Building finishes and components of a cosmetic/aesthetic nature exhibit the normal wear and tear that is expected in their design use, and have not exceeded their useful lives Building components do not pose a threat to the health and safety of occupants”
24
Physical Conditions Review
Maintenance versus Replacement Reserve Items: Maintenance refers to annual repairs and servicing such as; furnace servicing cleaning eaves troughs carpet cleaning basic plumbing repairs Replacement Reserve refers to the replacement of building elements that wear out over the life of the housing unit roofing carpets hot water heaters
25
Section 95 Advance Validations
Roles & Responsibilities of the First Nation: First Nation has control and responsibility for the construction and administration of the project To ensure the quality of work To arrange for progress reviews with FNH
26
Director of Technical Services
Contact Information: Monica Bradley, Director of Technical Services
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.