Download presentation
Presentation is loading. Please wait.
1
Broadway Plaza Redevelopment
February 19, 2013
2
Site Aerial
3
Site Constraints
4
Community Input - Key Themes
Improve the flow – look for ways to enhance the flow of traffic to and from Broadway Plaza; improve parking Focus on the pedestrian experience – Make the Broadway Plaza environment more comfortable and enjoyable Create a destination – Create a place, not just for shopping but that compliments and enhances the downtown area Consider the creek – Research a way to incorporate the Creek and its history into the plan Maintain the charm/connectivity with downtown – enhance the essential charm of Walnut Creek – from interesting retail choices to improved connectivity with traditional downtown Evolve smart – Create a framework with flexibility that can evolve to address future opportunities
5
Prior Concept Plans ( )
6
Redevelopment Plan Refinements
No residential uses proposed Broadway Plaza Street remains open Macy’s expands south Buildings on west side of BP Street remain open during initial phases Improved connection from Newell to BP Street
8
San Ramon Creek
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.