Download presentation
Presentation is loading. Please wait.
1
November Plenary Closing Report
Month Year doc.: IEEE yy/xxxxr0 November Plenary Closing Report IEEE P Wireless RANs Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva N. Mody < > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at > Apurva N. Mody, BAE Systems John Doe, Some Company
2
Outline IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report
Month Year doc.: IEEE yy/xxxxr0 Outline IEEE WG Agenda IEEE P – Progress Report IEEE P – Progress Report IEEE P – Progress Report IEEE P802.22a – Progress Report IEEE b – Progress Report IEEE P Spectrum Characterization and Occupancy Sensing (SCOS) Study Group Progress Report Letters of Assurance Past and Future Meetings Likely WG Motions at the November EC Meeting Apurva N. Mody, BAE Systems John Doe, Some Company
3
IEEE P802.22 WG Agenda Opening Plenary Motions at the EC
Month Year doc.: IEEE yy/xxxxr0 IEEE P WG Agenda Opening Plenary Motions at the EC Conditional Approval to Forward P802.22b to the Sponsor Ballot IEEE P – Revision Project Approved. Work not started IEEE P802.22a to IEEE SA RevCom IEEE P802.22b Enhancement to Broadband Services and Monitoring Applications - Working Group Letter Ballot On Going IEEE P Spectrum Characterization and Occupancy Sensing (SCOS) PAR Approved by the NESCOM Tutorial – None Mid-week plenary – Chair, Vice Chair and Secretary Elections Closing Plenary (Thursday, PM1) EC Meeting IEEE Meeting Agenda for the November 2014 Plenary can be found here Apurva N. Mody, BAE Systems John Doe, Some Company
4
IEEE P802.22.1 Advanced Beaconing Progress Report
Month Year doc.: IEEE yy/xxxxr0 IEEE P Advanced Beaconing Progress Report IEEE Standard was published in 2010 Revision Project on IEEE initiated that incorporates Advanced Beaconing for protection of systems in HF, VHF, UHF, and S-Band (2-4 GHz). Call for contributions made Apurva N. Mody, BAE Systems John Doe, Some Company
5
Month Year doc.: IEEE yy/xxxxr0 IEEE P Progress Report IEEE Standard was published on July 1st 2011. The revision PAR for IEEE Standard has been approved that folds in various on-going amendments (P802.22a, P802.22b) and generalizes it to other bands for spectrum sharing. The PAR form can be found here. Apurva N. Mody, BAE Systems John Doe, Some Company
6
Month Year doc.: IEEE yy/xxxxr0 IEEE P Progress Report IEEE Standard was published on Sept. 28th 2012. We would like to thank the members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Apurva N. Mody, BAE Systems John Doe, Some Company
7
IEEE P802.22a MIBs and Managememt Plane Procedures
Month Year doc.: IEEE yy/xxxxr0 IEEE P802.22a MIBs and Managememt Plane Procedures P802.22a Sponsor Ballot Process has been successfully completed Received RevCom Approval Standard was published in June 2014 Apurva N. Mody, BAE Systems John Doe, Some Company
8
IEEE P802.22b Enhancement for Broadband Services and Monitoring Applications
2012 2013 2014 1 3 5 7 9 11 Task Group formed x Process document Functional Requirements Call for Proposals issued Selection Criteria x x Technical/Informative Contributions Proposal presentations Baseline proposal selected Draft for 1st letter ballot 1st letter ballot completed Comment Resolution 2nd letter ballot completed Comment Resolution and recirculation Sponsor ballot RevCom/NesCom Approval Chang-woo Pyo (NICT) March 2012
9
IEEE P802.22.3 Spectrum Characterization and Occupancy Sensing
The IEEE P Spectrum Characterization and Occupancy Sensing (SCOS) PAR was approved by the EC and the IEEE SA NESCOM in July / August 2014 Chang-woo Pyo (NICT) March 2012
10
IEEE P802.22 Letter of Assurance
Month Year doc.: IEEE yy/xxxxr0 IEEE P Letter of Assurance The LoAs can be found on the website at as well as on the IEEE SA website Received one LoA from Hitachi Kokusai Apurva N. Mody, BAE Systems John Doe, Some Company
11
802.22 WG will not meet during Jan 2015 Session
Month Year doc.: IEEE yy/xxxxr0 Future Sessions IEEE Future Sessions are planned as follows Session Dates Location Interim January 11-16, 2015 Hyatt Regency Atlanta, Atlanta, GA WG will not meet during Jan 2015 Session Plenary March 8-13, 2015 Estrel Hotel and Convention Center, Berlin May 10-15, 2015 Hyatt Regency, Vancouver July 12-17, 2015 Hilton Waikoloa Village, Kona, HI September 13-18, 2015 TBD (Bangkok or Kuala Lumpur) November 8-13, 2015 Hyatt Regency Dallas, Dallas, TX January 17-22, 2016 March 13-18, 2016 Sands Venetian Hotel Macau, PRC Apurva N. Mody, BAE Systems John Doe, Some Company
12
No Tutorials Sponsored by the IEEE 802.22 Working Group this time
Month Year doc.: IEEE yy/xxxxr0 Sponsored Tutorial No Tutorials Sponsored by the IEEE Working Group this time Apurva N. Mody, BAE Systems John Doe, Some Company
13
802.22 WG MOTIONS AT THE EC CLOSING MEETING
November 2013 doc.: IEEE /1381r0 WG MOTIONS AT THE EC CLOSING MEETING Jon Rosdahl, CSR
14
Conditional Approval to Forward P802.22b to the Sponsor Ballot
November 2013 doc.: IEEE /1381r0 Conditional Approval to Forward P802.22b to the Sponsor Ballot Jon Rosdahl, CSR
15
Apurva N. Mody, BAE Systems
November 2014 Motion Motion for a Conditional Approval to Forward the IEEE P802.22b (Amendment on Enhancements for Broadband Services and Monitoring Applications) to the Sponsor Ballot Slide 15 Apurva N. Mody, BAE Systems
16
November 2014 Motion for a Conditional Approval to Forward the IEEE P802.22b to the IEEE Sponsor Ballot Rules as Per the LMSC OM Conditional approval is only appropriate when ballot resolution efforts have been substantially completed and the approval ratio is sufficient. "Substantially complete" is when there is a very low likelihood of receiving valid new Disapprove comment(s)/vote(s) upon the next recirculation ballot. If the requirements for conditional approval have not been met at end of that recirculation ballot, then one subsequent recirculation ballot may be conducted in an attempt to meet the conditional approval conditions. If the conditions are not met by the subsequent recirculation ballot, the conditional approval terminates. Conditional approval expires at the opening of the next plenary. Agenda Items and motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: • Date the ballot closed • Vote tally including Approve, Disapprove and Abstain votes • Comments that support the remaining disapprove votes and WG responses. • Schedule for recirculation ballot and resolution meeting.
17
November 2014 Motion for a Conditional Approval to forward the IEEE P802.22b to the IEEE Sponsor Ballot • Date the last ballot closed – 1st WG Re-circulation Ballot: Oct. 30th 2014 • Vote tally including Approve, Disapprove and Abstain votes: Ballot Pool = 32, Response = 27 (84%), # of comments = 26 Number of Approves = 23 Number of Disapproves = 1 Number of Abstains = 4 Approval Ratio = 96% • Comments that support the remaining disapprove votes and Working Group responses – b-p802-22b-draft-3-0-comment-database • Schedule for confirmation ballot and resolution meeting – We addressed and resolved all the comments during the November Plenary. Planning to launch the WG Re-circ #2 by Nov. 18th 2014.
18
November 2014 Motion for a Conditional Approval to forward the IEEE P802.22b to the IEEE Sponsor Ballot Negative Comments Ten Technical Required Comments from One remaining Negative Voter (Mr. Ranga Reddy) were addressed and resolved during this Plenary Meeting. Mr. Reddy participated in the comment resolution process. Comments and their resolutions can be found in the Comment Database Rev1
19
IEEE P802.22b Draft History and Statistics
IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Response Ratio Approval Ratio Draft Status WG LB #1 (P802.22b Draft v1.0) Nov. 2013 232 (27 TR / 4ER) Comments were addressed and Resolved 75% 58% P802.22b Draft v2.0 Prepared WG LB #2 (P802.22b Draft v2.0) July 2014 97 (10TR / 4ER/ 36 T) 78% 91% P802.22b Draft v3.0 Prepared WG Re-circ #1 (P802.22b Draftv 3.0) Oct. 2014 26 (10TR / 3T) 84% 96% P802.22b Draft v4.0 Prepared WG Re-circ #2 (P802.22b Draft v4.0) Nov. 2014 P802.22b is ON TRACK to reach the Sponsor Ballot by December 2014 Slide 19 Apurva N. Mody, BAE Systems
20
Apurva N. Mody, BAE Systems
November 2014 Motion for a Conditional Approval to forward the IEEE P802.22b Draft Standard to the IEEE SA RevCom Time-line for the Launch of P802.22b WG Re-circ #3 and Sponsor Ballot #1 The Sponsor Ballot Pool Formation is complete – Sponsor Ballot Pool is balanced according to the IEEE SA Staff. Nov. 18th Issue IEEE P802.22b Draft 4.0 Dec. 2nd 2014 – Re-circulation #2 is completed. Dec. 10th 2014 – Address and Resolve Comments if any. Dec. 12th 2014 – Launch Sponsor Ballot #1 Slide 20 Apurva N. Mody, BAE Systems
21
P802.22b WG Motion 2 – Document – 22-14-0143 Rev0
November 2014 WG Motion P802.22b WG Motion 2 – Document – Rev0 Move to authorize the WG chair to make a motion to the IEEE 802 executive committee for conditional approval to forward the P802.22b draft amendment standard to the sponsor ballot and to launch a sponsor ballot based on the latest P802.22b draft amendment standard that has met all the conditions as stated in the IEEE 802 Operations Manual. Move: Keat-beng Toh Second: Shigenobu Sasaki For: 7 Against: 0 Abstain: 0 Motion Passes. Slide 21 Apurva N. Mody, BAE Systems
22
Apurva N. Mody, BAE Systems
November 2014 Motion for a Conditional Approval to forward the IEEE P802.22b Draft Standard to the Sponsor Ballot Motion to grant conditional approval as per the IEEE 802 Operations Manual to forward IEEE P to the Sponsor Ballot. Move: Apurva N. Mody, Second: Bob Heile For: Against: Abstain: Motion Passes / Fails Motion Withdrawn. This motion will be re-introduced at a later date via Ballot or during the EC Telecon Slide 22 Apurva N. Mody, BAE Systems
23
Apurva N. Mody, BAE Systems
November 2014 References IEEE WG November Plenary Motions – Rev0 WG Policies and Procedures – Rev0 P802.22b Draft v3.0 Re-circ #1 Comment Database – Rev1 P802.22b Draft v2.0 Comment Database – Rev5 P802.22b Draft v1.0 Comment Database – Rev3 P802.22b Coexistence Assurance Document – Rev1 P802.22b PAR Form – Rev4 P802.22b 5C Document Rev4 Slide 23 Apurva N. Mody, BAE Systems
24
References Jon Rosdahl, CSR
November 2013 doc.: IEEE /1381r0 References November 2014 Plenary Working Group Agenda Jon Rosdahl, CSR
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.