Download presentation
Presentation is loading. Please wait.
1
TWO-WAY SYSTEM WITH UNBONDED TENDONS
2
EXAMPLE OF A SLAB BAND (Wide Shallow Beam)
3
EXAMPLE OF A TWO-WAY FLOOR SYSTEM (California)
4
EXAMPLE OF A ONE-WAY SLAB AND BEAM SYSTEM
5
FLAT DUCT GROUTED POST-TENSIONING
Ngee Ann City, Singapore - BBR
6
FLAT DUCT GROUTED POST-TENSIONING
7
STRAND AND FLAT DUCTS FOR GROUTED PT SYSTEM
8
THREADED FOUR STRAND DUCTS READY FOR LAYOUT
9
VIEW OF DEAD END
10
TENDON ARRANGEMENT AROUND COLUMN
11
LIVE (STRESSING) ENDS AT SLAB EDGE
12
LIVE (STRESSING) ENDS AT SLAB EDGE
13
AN ALTERNATIVE FOR DEAD ENDING STRANDS
14
IMPROVISING TENDON DEAD ENDS
15
CONSTRUCTION JOINT WITH INTERMEDIATE STRESSING
16
DUCT SPLICING
17
UNROLL AND LAYOUT FLAT DUCTS PUSH STRANDS THROUGH EACH DUCT
18
DEAD END ARRANGEMENT ALTERNATIVE
TENDON LAYOUT
19
ROUND DUCT GROUTED POST-TENSIONING
20
CONGESTION OF MONOSTRAND ANCNOR DEVICES FOR LARGE POST-TENSIONING FORCES
21
EXAMPLES OF POST-TENSIONING CONSTRUCTION
MISUNDERSTANDING OF STRUCTURAL CONCRETE AND POST-TENSIONING
22
Thank you for listening
23
Log file for PT_introduction.ppt
add two jpgs to place holder slide 29, otherwise OK
24
LIVE (STRESSING) ENDS AT SLAB EDGE
25
LIVE (STRESSING) ENDS AT SLAB EDGE
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.