Download presentation
Presentation is loading. Please wait.
1
Characterization Update
Slade J. Jokela
2
Repairs/Upgrade still underway
Ar+ Gun is still out of commission Should receive part by Monday Borrowed another power supply from Bob Will give finer precision control over electron beam current Will see if lower beam currents are possible Scan of parameter-space for beam current is currently under way. Necessary to determine constant-current parameters
3
Malter Effect Field Emission
When electron beam is removed from sample, “secondary emission” continues Sample is negatively biased (~200V, though this is still seen at lower potentials) See video on blog for observation of emission (sorry if you can’t view video) or Sample was placed in front of LEED screen Will determine if this is indeed Malter Effect and how much it affects my secondary electron yield results
4
Continued Work Expect to be able to measure 1nA with new setup
Will know by the end of the week Chamber still needs to be opened, but am waiting for repair parts to arrive Will retrieve ‘lost’ samples at that time
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.