Download presentation
Presentation is loading. Please wait.
Published byЖељко Смиљанић Modified over 5 years ago
1
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Q:\Pictures\Industrial\NWQ\Crescent Bus Ctr\CBC_Logo copy.jpg Q:\Pictures\Industrial\NWQ\Crescent Bus Ctr\area-map-for-promopak.jpg Q:\Pictures\Industrial\NWQ\Crescent V\Crescent V and VI Marketing Site Plan.jpg Q:\Pictures\Industrial\NWQ\Crescent v\Crescent V Building Footprint For Lease jpg Q:\Research\Projects\Scott\Crescent Business Center Land\Crescent Business Center Land Close Aerial.jpg WAREHOUSE / DISTRIBUTION / MANUFACTURING SPACE * Total Size 51,800 SF Property Features Total Building Size: 57,975 SF Atlee/Elmont exit off I-95 Class A distribution/flex facility 125’ deep truck court Visibility/signage opportunity on Interstate 95 and Lakeridge Parkway 9’ store front glass Demographics 1 Mile 3 Miles 5 Miles Population XX,XXX No. of Households XX Avg. HH Income $XX Daytime Population Building Features Total Available 12,785 SF Bays Approximately 50’ x 175’ Loading Dock Sprinkler ESFR (high capacity) Ceiling Height 24’ clear
2
New 51,800 sf Office/Warehouse structure
Clear Height: 24' Building Dimensions: Depth Approximately 180' Length Approximately 287' Floor Slab: 6" of compacted stone 8 mil poly vapor barrier 6x6xW2.1xW2.1 welded wire fabric 4,000 PSI, 5" thick concrete with saw cut joints Structural Bays: Typical column widths at increments of 40' front to back by 50' side by side Front Elevation: Storefront entry alcoves (consistent with Crescent Building IV) Rear Loading Dock: Pre-engineered 9' x 10' overhead doors, 24 gauge steel Within a 12' x 14' knock-out panel for drive-in doors One ramped drive-in 12' x 14' overhead doors at each end Personnel Doors: Galvanized steel stairs Platforms covered by pre-finished metal awnings Rear Wall Panels: Knock out panels for future dock levelers (1) 5'-4" x 15' transom window per panel at rear wall Side Elevation: (3) 5' x 4'-6" knock out panels for future punched windows Concrete and EIFS detailing (consistent with Crescent Business Center) Roof: White Carlyle TPO (reduces utility costs) Polyisocyanurate Rigid Insulation board, R = 20 Roof Access: One caged roof access ladder Interior Riser Room: For fire suppression system riser, domestic water rise, alarm panel, house panel, and telephone boards Sprinkler: Wet ESFR rated sprinkler system Electric: 480/277, 3-phase, 4-wire high voltage to building Exterior: 8" concrete, architectural panels, poured on slab
3
J:\USER\SHARED\Crescent Business Center\Phase II Development\Crescent Phase II Master Plan.jpg
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.