Presentation is loading. Please wait.

Presentation is loading. Please wait.

Flexible Services iNotice Board Saturday, January 16, 2016

Similar presentations


Presentation on theme: "Flexible Services iNotice Board Saturday, January 16, 2016"— Presentation transcript:

1 Flexible Services iNotice Board Saturday, January 16, 2016
3/14/13 • Watervliet Avenue • cdta.org 1

2 STAR Daily Performance for Saturday, January 16, 2016
Actual Trips: 257 Actual Passengers Transported: 291 Overall On Time Performance: 98.8% Scheduled: 51% Appointment Time: 100% Productivity: 1.3 110 Watervliet Avenue • cdta.org 2

3 Advantage Transit Daily Performance for Saturday, January 16, 2016
Actual Trips: 183 (42%) Actual Passenger Transported: 184 Overall On Time Performance: 96.0% Scheduled: 96.2% Appointment Time: 93.3% Productivity: 3.55 110 Watervliet Avenue • cdta.org 3

4 STAR & Advantage Overall Daily Productivity for Saturday, January 16, 2016
Total Trips: 440 Trip Per Hour: 2.2 Actual Passengers Transported: 475 110 Watervliet Avenue • cdta.org 4

5 STAR & Advantage Space/Passenger Type Saturday, January 16, 2016
STAR Transported: Ambulatory Wheelchair / Scooter, Etc Advantage Transported: Ambulatory Wheelchair / Scooter, Etc Total : Ambulatory Wheelchair / Scooter, Etc Note: Passenger count can be higher than trips performed. This includes all passengers except SVA. 110 Watervliet Avenue • cdta.org 5

6 Flexible Services Performance Goals
On Time Performance Goal : 95% Overall On Time Performance (STAR and Taxi) On time is defined as no more than 0 minutes early or 25 minutes late for a scheduled trip Productivity Per Hour Goal : 2.0 Overall Passenger trips per revenue hour (STAR and Taxi) Total revenue hours operated monthly divided by number of completed trips 110 Watervliet Avenue • cdta.org 6


Download ppt "Flexible Services iNotice Board Saturday, January 16, 2016"

Similar presentations


Ads by Google